Laserfiche WebLink
t <br /> � . �� 1�080i7 <br /> area. There is no reason to suspect any unexploded ordinances to be present <br /> in <br /> these areas. <br /> 4.0 CONCLUSION <br /> (a) An inspection for leaks was conducted in April 1995.No leaks were found on <br /> the underground facilities surveyed. <br /> (b) One above ground leak was detected and repaired in Apri11995. <br /> � . � <br /> � Results from the Final Document"Remedial Investigation/Feasibility Study" � <br /> (RI) dated November 1996 conducted by U.S. Army Environmental Center <br /> indicates that soil in Operable Unit 1 (OU1)has a minimal amount of <br /> contamination with concentrations of contaminates far below the risk-based <br /> industrial cleanup levels. <br /> (d) Army construction, excavation or maintenance work in the RDX plume that � <br /> requires dewatering will involve explosives contaminated water discharge. � <br /> Coordination with the Army prior to such work is mandatory. <br /> (e) No further remedial action will be conducted on the land«�here the natural gas <br /> distribution system enters into each Loadline in accordance with U.S. Army <br /> Environmental Center's (USAEC)Draft Final of the Feasibility Study for <br /> .' Operable Unit One(LJnsaturated Zone) dated April 1997. <br /> 5.0 RECOMMENDATIONS <br /> It is recommended the entire natural gas distribution system be sold to a local <br /> utility company. An easement of twenty to fifty feet will be provided to allow access to <br /> the gas line on the Government-Owned property of the Cornhusker Army Ammunition <br /> Plant. � <br /> Reviewed by: <br /> /s/ 19 September 1997 <br /> Ms. Jo Short (Date) <br /> Realty Specialist <br /> Approved by: <br /> /s/ 19 September 1997 <br /> Thomas L. Jamieson (Date) <br /> Commander's Representative <br /> � <br /> , 6 . ,, , , � <br /> � <br /> � , <br /> • ..f <br />