My WebLink
|
Help
|
About
|
Sign Out
Browse
99106375
LFImages
>
Deeds
>
Deeds By Year
>
1999
>
99106375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2012 6:13:40 PM
Creation date
10/20/2005 11:47:33 PM
Metadata
Fields
Template:
DEEDS
Inst Number
99106375
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "D" <br /> TO DEVELOPMENT AGREEMENT (Continued): 9!J 10 6 3 7 5 <br /> Category III. On-site work for Parcel Land Area Percent Share <br /> Phase 1, as defined in Section 5.5 of 1 40,135 12.81 <br /> this Development Agreement (except 2 273,260 87.19 <br /> as specifically included in Category II); TOTAL: 313,395 100.00 <br /> finished Common Area wark, including <br /> without limitation paving, lighting, pad <br /> preparation (as described in Section <br /> 5.5), and landscaping, for Phase 1 only; <br /> and the construction and maintenance <br /> of temporary access facilities as <br /> reasonably required to provide <br /> continuous access for construction <br /> vehicles and equipment to Tenant's <br /> Building and Landlord's Building and <br /> the staging areas for Parcels 1 and 2, <br /> which costs shall be prorated between <br /> Parcels 1 and 2 based on land area: <br /> Category IV. All Site Work for Parcel Land Area Percent Share <br /> development of the drive aisles 1 40,135 5.95 <br /> running north-south along (a) the 2 273,260 40.53 <br /> common boundary line between 20 60,407 8.96 <br /> Parcels 24 (on the west) and 25 21 63,950 9.49 <br /> and 26 (on the east), and (b) the 22 39,215 5.82 <br /> common boundary lines between 23 45,734 6.78 <br /> Parcels 20 and 21 ( on the west) 24 57,500 8.53 <br /> and Parcels 22 and 23 (on the 25 57,363 8.51 <br /> east). These costs are to be 26 36,622 5.43 <br /> prorated among Parcels 1 and 2, TOTAL: 674,186 100.00 <br /> and 20-26, based on land area: <br /> BREAKDOWN OF PARCELS' PROPORTIONATE <br /> SHARES OF SITE WORK COSTS, page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.