Laserfiche WebLink
99 106354 <br /> specifications approved by the Director of Public Works and subject to the City's inspection, and the <br /> final drainage plan as approved and recorded. The Subdivider agrees to grade all lots in the <br /> subdivision in conjunction with the development proposed thereon so that storm drainage is <br /> conveyed to a public right-of-way,public detention facility, drainway, U.S. Highway 281 drainage <br /> ditch or other drainage systems so approved by the Director of Public Works. <br /> 5. Traffic Issues. The Subdivider agrees to the following: <br /> (A)Lots seven(7), twenty-five(25),twenty-six (26),twenty-seven(27),twenty-eight <br /> (28) and twenty-nine (29) shall not be allowed to have curb cuts onto Webb Road. <br /> (B) Lots twenty-one (21), twenty-three (23), twenty-four(24) and twenty-five (25) , <br /> shall not be allowed to have direct access onto 13th Street, except by means of the thirty <br /> (30.0) foot private drives in easements as shown on the final plat. <br /> (C) Lot eleven(11) shall not be allowed to have a curb cut onto Faidley Avenue. A <br /> curb cut from Lot Ten (10) onto Faidley Avenue may be permitted, subject to approval by <br /> the Director of Public Works. <br /> (D)The three private driveways connecting to Webb Road will provide two exit lanes <br /> each. One exit lane will be marked to indicate left turn only and the other to indicate right <br /> turn only. The northern and middle driveways are shown on the final plat. The southern <br /> driveway shall be located within the sixty(60.0) foot drainage easement on Lot Eight (8). <br /> (E) The Subdivider agrees to construct the traffic signal at the middle Webb Road <br /> drive as soon as traffic at the intersection meets warrants as outlined in the Manual of <br /> Uniform Traffic Control Devices. The signal design will be approved by the City Public <br /> Works Department and will include "hard wire" interconnection with signals to the north and <br /> south. <br /> (F)The Subdivider recognizes that the northerly drive may also meet warrants under �� <br /> the Manual of Uniform Traffic Control Devices but that the current Traffic Engineering � <br /> Study does not recommend signalization since the driveway is considered to be too close to <br /> the intersection with 13�' Street. However,the Subdivider agrees to install a traffic signal on <br /> this driveway at any time after traffic at the driveway meets warrant as outlined in the <br /> Manual of Uniform Traffic Control Devices if the City so directs. If required, the signal <br /> design will be approved by the City Public Works Department and will include "hard wire" <br /> interconnection with signals to the north and south. Placement, location and width of <br /> entrances off Allen Drive within the subdivision shall conform to the Grand Island City <br /> - 4 - <br />