Laserfiche WebLink
Exhibit "A" 08/13/2026 <br />Crossing consists of 12 count fiber optics in orange 2" HDPE conduit. No above ground <br />facilities are added as part of this project. <br />The Grand Island Streets Division shall be contacted prior to work beginning at 308- <br />385-5322. <br />A Notice to Proceed with work in the ROW will not be given until a pre -construction <br />notice has been given; the City of Grand Island permit number is required when <br />requesting the Notice to Proceed. <br />Any keyhole potholing locations in the roadway shall be approved by the Streets <br />Division and shall be filled within five days of potholing. <br />No handholds or vaults shall be placed in the flowline or sloped bank of drainage <br />ditches. If it has to be placed on sloped bank the final grade of hand hold or vault lid <br />shall match that of the sloped bank. <br />Erosion control shall be in place for all open excavations adjacent to drainage ditches. <br />All drainage ditch flowlines must be restored before job is done. <br />No handholds, vaults, or manholes shall be placed in the ADA accessible area of the <br />