My WebLink
|
Help
|
About
|
Sign Out
Browse
202601975
LFImages
>
Deeds
>
Deeds By Year
>
2026
>
202601975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2026 3:38:27 PM
Creation date
3/31/2026 3:37:34 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202601975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAKING SHEET- UNDERGROUND <br />Company: OPTK Networks Exchange: Beatrice <br />CONSTRUCTION PROJECT NOTES <br />I. The State. County, City personnel shall be notified a minimum of forty eight (48) hours in advance of initial project <br />construction. <br />2. The utility company and the contractors) are responsible to have at least one person on the job at all times, that is <br />'see supervisor' certified. <br />3. The contractor shall adhere to the current permit and contract specifications. <br />4. The locations of all aerial and underground utility facilities may not be indicated an the project plans. The contractor <br />is required to contact the Nebraska and Colorado 811 one call notification center (dial 811) forty-eight 148) hours <br />poor to working in the city right of way. No excavation will be permitted in the area of the underground utilities until <br />all facilities have been located and identified to the satisfaction or all parties. The contractor shall be responsible for <br />protection of at underground and aerial utilities and nfrastructure. <br />5. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical <br />location of the underground facility is unknown, the contractor shall use special measures to determine the locations <br />of such underground facerties. <br />a. If the contractor is conducting the excavation by digging from the surface. when in a close proximity to the <br />underground facilities. the contractor shall use hand digging, hydro excavating, or air excavating to locate such <br />facility. <br />b. If the contractor is conducting the excavation by funneling or boring, the contractor shall determine the vertical <br />location of the underground facility by potholing or any other method approved by the director of pubic works and <br />utilities <br />8. Project plans shall dimension new facilities being installed. <br />7. Unless agreed to in wntng In advance the depth of installed facilities in city and county row shall be at a minimum <br />as meows: <br />a. Forty-eight (48) inches in soil <br />b. Forty-eight (48) inches below a projecteb slope front the flow tine of a ditch at a three (3) horizontal and one II <br />vertical slope. <br />o. Forty-eight (48) inches under a roadway measured from the surface of sad roadway to the top of the nstallatron. <br />a. Sixty (80) inches under a storm water or creek channel design bottom or pipe, and <br />e. Mailmen a minimum of twenty-four (24) Inches of vertical and hor¢ontal spacing from existing utilities. <br />t Be located as far front the existng or proposed curb line as possible to avoid potential future conflicts. <br />8. Al non -street surface materials that are disturbed by excavation and backbiting operations shad be replaced and <br />restored <br />g. City and county street surface materials disturbed shall be backfilled, tamped and replaced by city or county forces <br />or approved paving contractor <br />10. If sidewalk. wheel chair ramps or any portion of the pedestran facilities are removed or closed. a pedestrian detour <br />shall be established and maintained during the time of the closure and the entire pedestrian facility shall be restored <br />whin seventy-two (72) hours. unless the contractor provides a hard surface alternate route approved by the city or <br />county <br />11. Al pedestrian detours and any reconstruction of pedesbuan facilities shall meet current Americans with Disability <br />Act (ADA) standards and specifications. <br />12. Al pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />'3. All holes made in the streets for the purpose of perfarmng vacuum excavations to locate underground utilities shall <br />be restored to their original condition with the reinstated core fkish with and in the original orientation as the existing <br />surface matching existing pavement surface appearance. <br />When the contractor is not actively waking, all equpmernt, fencing, debns, etc. Shall not be placed curt to the <br />tnangiear area required for sight distance of cetades exiting or entering an adjacent property or Intersector. <br />Al excavations shad be adequately fenced and covered when contractor is not present or protect site loft <br />untended. <br />18. No lane closures allowed on artenal streets dung AM and PM peak hours. <br />17. All work zone traffic Control. including pedestrian control measures, shall be in comptianoe tenth the MUTCD and <br />ADA <br />18. The contractor shall maintain a set of "as !wilt' plans on site with dimensioning. These plans shall be presented <br />upon request <br />19. Final "as -built" plans shall be filed with city and/or county within 30 days of the completon of the project. <br />20. The omtractor shall follow construction standards pertaining to the lateral corridor facility placement and mirvmum <br />depth requirements and clearance requirements of other facilities <br />21. A current State, County. or City permit shall be maintained on each work site by the contractor. The Contractor <br />shall present such permit upon request. <br />22. Any field adjustments to Installation of facidres, which vary from the plans that have been submitted and approved <br />during the permil application process, shall comply wrth the following: <br />a. The contractor must stop work enmediately and contact the facility owner of the proposed changes. <br />b. The facility owner's representative shad contact the city. county or state right-of-way construction inspector and <br />provide them with the details. <br />e The ROW inspector will make a determination on how to proceed. This determination may range from approval <br />over the phone or via email to delaying the project until plans can be updated and appropriate review can be <br />conducted. <br />23. Stake mounted waning signs and marker posts (BM53) to be placed where appropriate. <br />24. All conduit and fiber is to be installed at the back of the roadway ROW unless otherwise noted. <br />25. Leave 120' loops (60' tails at spice points) for mainline fiber In vaults <br />
The URL can be used to link to this page
Your browser does not support the video tag.