My WebLink
|
Help
|
About
|
Sign Out
Browse
202601610
LFImages
>
Deeds
>
Deeds By Year
>
2026
>
202601610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 10:57:03 AM
Creation date
3/17/2026 10:54:03 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202601610
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall be notified a minimum of forty eight (48) hours in advance of initial project construction. 12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />2. The convector shall adhere to the current City standard specifications, approved special provisions, Cm standard plans, nigh[ -of -way construction and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />contractor provides a hard surface alternate route approved by the city. <br />procedures manual. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One specifications. <br />Call 811 notification center (dial 811) forty-eight (48) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible for 14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />facility is unknown, the permittee shall use special measures to determine the locations of such underground facilities. surface appearance. <br />a. If the pemcttee is conducting the excavation by digging from the surface, when in e close proximity to the underground facilities, the pemittee 16. When the contractor is not actively working, all equipment, fencing, debris, etc, shall not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locate such facility sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. If the permittee is conducting the excavation by tunnehcg or boring, the pemniltee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. 17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being instilled. Measurements shall be taken from existing adjacent visible structures (curbs, poles, 18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets, fire hydrants, etc.) clearly identifying location of such facility. The contractor shall verify dimensions taken from city files. section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed facilities in city row shall be at a minimum as follows. 19. All work zone traffic control, including pedestrian control measures, shall be in compliance with the MUTCD, ADA, and the City Standard <br />Specifications. <br />a. Thirty-two (30) inches in soil, if rock present and is an issue twenty-four (24) inches can be used. <br />20. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />b. Forty-two (42) inches below a projected slope from the flow line of a ditch at a three (3) horizontal and one (I) vertical slope. and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />c. Forty-eight (48) inches under a roadway measured from the surface of said roadway to the top of the installation. 21. The contractor shall maintain a set of "as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />d. Forty-eight (48) inches under a storm water or creek channel design bottom of pipe, and <br />22. A current city right of way construction permit and city approved plan set shall be maintained on each work site by the contractor. <br />a Maintain a minimum of twenty-four (24) inches of cortical and horizontal spacing from existing utilities. contractor shall present such permit and plan set upon request to any city representative. <br />The <br />the permit <br />f Be located as far from the existing or proposed curb line as possible to avoid potential future conflicts. 23. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during <br />application process, shall comply with the following: <br />7. All potholes in sidewalk panels will be tilled unless daunted by City inspector. If colored textured or patterned concrete is existing, replacement a. The contractor must stop work immediately and contract the facility owner. <br />patches, and panels panels will he replaced to match as <br />starting work. <br />8. All non -street surface materials that are disturbed by <br />practicable. Owner may be required to put money into escrow to cover all repairs prior to <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details <br />excavation and backfilling operations shell be replaced and restored. <br />9. City street surface materials disturbed shall be backfilled, tamped and repaved by city forces or approved paving contractor. of the proposed charges. <br />The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or via <br />10. All CoMWt, vaults and Pedestals shall be located in the public ROW and in public utility easements. email <br />email to delaying the project until plans can be updated and appropnate review can be conducted. <br />It All Aerial shown on attached planer will be permitted separately by Pole Owners. All pole permits submitted to pole owners will follow <br />NESC codes. <br />Special Notes <br />1. All conduit shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />4. The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the T18 "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />�� �� <br />Know what's below. <br />811 before you dig. <br />Alto <br />FIBER <br />N <br />A <br />PAGE 3of16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.