My WebLink
|
Help
|
About
|
Sign Out
Browse
202601280
LFImages
>
Deeds
>
Deeds By Year
>
2026
>
202601280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 10:42:59 AM
Creation date
3/17/2026 10:42:25 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202601280
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAKING SHEET UNDERGROUND Company: OPTK Networks <br />Exchange: Beatrice <br />CONSTRUCTION PROJECT NOTES <br />1. The State. County, City personnel shall be notified a minimum of forty eight (48) hours in advance of irctur project <br />construction. <br />2. The utility company and the contrar.tur(s) are responsible to have at least one person on the job at all limes, that is <br />"site supervisor' certified. <br />3. The contractor shall adhere to the current permit and contract specifications. <br />4. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor <br />is required to contact the Nebraska and Colorado 811 one call notification center (dial 811) forty-eight (48) hours <br />poor to working in the city right of way. No excavation will be permitted in the area of the underground utilities until <br />all facilities have been located and identified to the satisfaction of all panes. The contractor shall be responsible for <br />protection of at underground and aenal utilities and nfrastructue. <br />5. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical <br />location of the underground facility is unknown. the contractor shall use special measures to determine the locations <br />of such underground fealities. <br />a. If the contractor is conducting the excavation by digging from the surface, when in a close proximity to the <br />underground facilities, the contractor shall use hand digging, hydro excavating, or am excavating to locate such <br />facility. <br />b. If the contractor is conducing the excavation by tunneling or boring, the contractor shall determine the vertcal <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />utikties- <br />8. Project plans shall dimension new facilities being nsta1led. <br />7. Unless agreed to in writing n advance the depth of installed facilities n cry and county row shall be at a minimum <br />as follows: <br />a. Forty-eight (48) inches in soil <br />b. Forty-eight (48) inches below a projected slope front the flow line of a ditth at a three (3) horizontal and one (I I <br />vertical slope. <br />c. Forty-eight (48) inches under a roadway measured front the surface of said roadway to the top of the installation. <br />d. Sixty (80) inches under a storm water or creek channel design bottom or pipe, and <br />e. Maintain a minimum of twenty-four (24) inches of vertical and horizontal spacing from existing utilities. <br />f. Be located as far horn the existing or proposed curb fine as possible to avoid potential future conflicts. <br />8. All non -street surface materials that are disturbed by excavation and bac kflling operations shall be replaced and <br />restored. <br />B. City and county street surface materials disturbed shall be backfilled. tamped and repaved by city or county forces <br />or approved paving contractor <br />ID. If sidewalk. wheel chair ramps or any portion of the pedestrian fealties are removed or closed, a pedestrian detour <br />shall be established and maintained during the time of the closure and the enure pedestrian facility shall be restored <br />within seventy-two (72) hours, unless the contractor provides a hard surface alternate route approved by the city or <br />county_ <br />11. All pedesrnah detours and any reconstruction of pedestrian facilities shall meet current Americans *nth Disability <br />Act (ADA) standards and specifications. <br />12- At pedestrian detours shall be part of an approved Traffic Control Plan (TCPI <br />13- Al holes made in the streets for the purpose of penformng vacuum excavations to locate underground utilities shall <br />be restored to their original connition with the reinstated core flush with and in the anginal orientation as the existing <br />surface matching existing pavement surface appearance. <br />14. When the contractor is not actively working: all equipment. fencng. debns, etc. Shall not be placed within the <br />triangular area required for sight ttstanoe of vehicles exiting or entering an adjacent property or intersection. <br />15. At excavations shall be adequately fenced and covered when contractor is not present or project site left <br />unattended. <br />18. No lane closures allowed on arteral streets ounng AM and PM peak hours. <br />17. All work zone traffic control. ndudng pedestrian control measures, shall be in compliance with the MUTCD and <br />ADA <br />18. The contractor shall maintain a set of `as built plans on site with dimensioning. These plans shall be presented <br />upon request. <br />le. Final "as -built" plans that be filed with city and/or county within 30 days of the completion of the project. <br />20. The contractor shall follow construction standards pertaining to the lateral corridor facility placement and minimum <br />depth requirements and clearance requirements of other facilities. <br />21. A current State. County. or City permit shall be maintained on each work stte by the contractor. The contractor <br />shaft present such permit upon request <br />22. Any field adjustments to instataton of facilities, which vary from the plans that have been submitted and approved <br />during the permit application process. that comply with the following: <br />a. The contractor must stop world immediately and contact the facility owner of the proposed changes. <br />b. The facility owners representative shall contact the city. county or state light -of -way construction inspector and <br />provide them with the details. <br />c. The ROW inspector will make a determinabon on how to proceed. This determrraton may range from approval <br />over the phone or via emai to delaying the project until plans can be updated and appropriate review can be <br />conducted. <br />23. Stake mounted warning signs and marker posts (BM53) to be placed where appropriate. <br />24. All conduit and fiber is to be installed at the back of the roadway ROW unless otherwise noted. <br />25. Leave 120' loops (60' tails at splice points) for mainline fiber in vaults <br />
The URL can be used to link to this page
Your browser does not support the video tag.