Laserfiche WebLink
202504540 <br />NORTH <br />NEW 2' (2-18' O.D.) SCH 40 PVC CONDUIT FOR NEW SMALL <br />CELL ELECTRICAL CONDUCTORS (3 43 CU) BE I WEEN PULL <br />BOX AND POLE BASE (APPROX, 2'R) <br />REPLACEMENT DIRECT -EMBED POLE 6 <br />ELECTRIC METER, BY VERIZON <br />mown Immo. <br />NEW ELECTRICAL PULL BOX TO CAPTURE SMALL <br />CELL CIRCUIT NEAR POLE BASE; HUBBELL <br />PG1324BA18 OR EQUIV. <br />yair -vAPPROX. RIGHT OF WAY - <br />NOE <br />SS <br />SS <br />SS SS <br />NEW 7 (2-3/B• O.D.) SCH 40 PVC CONDUIT FOR NEW SMALL <br />CELL ELECTRICAL CONDUCTORS 13 E3 CUI BETWEEN PULL <br />BOXES (APPROX 168'2), TO BE DIRECTIONALLY BORED <br />1 <br />NEW INTERMEDIATE ELECTRICAL PULL BOX FOR SMALL CELL <br />CIRCUIT AT N.E. CORNER OF STATE ST. W. AND CLEBURN ST. N.; <br />HUBBELL PG1324BAIB OR EOUIV,; INSTALLED IN GRASSY AREA <br />• <br />• • <br />• <br />ss ' <br />NEW FIBER HAND HOLEIDEMARC AND <br />UNDERGROUND FIBER OPTIC SERVICE, <br />BY PROVIDER <br />EXISTING STREETLIGHT CIRCUIT TO BE RE -FED INTO <br />REPLACEMENT POLE BASE; COORDINATE SERVICE <br />CONNECTION WITH GRAND ISLAND UTILITIES <br />EXISTING CITY STREETLIGHT CIRCUIT SOX, TO REMAIN <br />SS S5 <br />STATE ST. W. <br />.APPROX. RIGHT OF WAYS <br />ST <br />ST <br />SS <br />SS 55 <br />ST SI <br />ST <br />SS <br />NEW 7 (2-318- O.D.) SCH 40 PVC CONDUIT FOR NEW SMALL CELL <br />ELECTRICAL CONDUCTORS (3 43 CUI BETWEEN PULL BOX AND <br />POWER SOURCE (APPROX. 75'3), TO BE DIRECTIONALLY BORED <br />Si <br />ST <br />ST0 <br />120/240V ELECTRICAL SERVICE FOR SMALL CELL AVAILABLE AT <br />EXISTING UNDERGROUND PULL BOX: COORDINATE ACCESS AND <br />SERVICE CONNECTION WITH GRAND ISLAND UTILITIES <br />55 <br />OUTILITY PLAN\ <br />Z <br />�B'DUCTILE IRON \ n <br />WATER MAIN <br />ST ST <br />24' CONCRETE <br />STORMWATER MAIN <br />5T 51 <br />SS <br />\"' EXISTING CITY LIGHT POLE A OTHER <br />CARRIER SMALL WIRELESS fACILITY <br />\'--.—+EXISTING UNDERGROUND ELECTRIC <br />SS <br />10' 0 10. 20' <br />SCALE: 11• x 17 - T' = 20' <br />22'>t 34'-I'=TY <br />LEGEND: (THIS SHEET) <br />GAS MAIN <br />SANITARY SEWER 55 <br />STORM SEWER ST <br />STREET UGHTS -E <br />FIBER OPTIC -P0 <br />WATER - • <br />TELEPHONE <br />OVERHEAD ELECTRIC DIE <br />NEW ELECTRIC -E <br />NEW FIBER OPTIC EO <br />SS <br />ST <br />EO <br />• <br />SS <br />Si <br />CIE <br />FO <br />•- <br />RE <br />E- <br />FO <br />NOTES: (THIS SHEET) <br />1. THE NEW POWER MD FIBER ROUTES ARE PRELIMINARY. AND WILL BE <br />CONFIRMED WITH THE ELECTRIC UTILITY AND ONEFIBER PRIOR TO <br />CONSTRUCTION. IF THE GENERAL CONTRACTOR NOTICES ANY <br />DISCREPANCIES BETWEEN THESE PLANS AND THE ACTUAL SOURCES OF <br />POWER AND FIBER, THE VERIZON CONSTRUCTION ENGINEER AND PROJECT <br />ENGINEER ARE TO BE NOTIFIED PRIOR TO COMMENCING WORK. <br />2. CONTRACTOR TO COMPLETE UTILITY LOCATE PRIOR TO COMPLETING ANY <br />CONSTRUCTION ACTIVITIES. <br />3. CONTRACTOR TO MAINTAIN A MINIMUM 4B' OF COVER BETWEEN <br />DIRECTIONAL CORE AND ROADWAY PAVEMENT TO THE EXTENT PRACTICAL. <br />4. CONTRACTOR TO PROVIDE A MINIMUM OF 12' OF CLEARANCE BETWEEN <br />NEW CONDUIT AND EXISTING UTILITIES. <br />5. ALL CONCRETE DAMAGED AS PART OF THIS WORK TO BE <br />REPAIRED/REPLACED TO ITS ORIGINAL CONDITION. <br />6. ALL ASPHALT REMOVED DURING CONSTRUCTION IS TO BE PATCHED AND <br />REPAIRED TO ITS ORIGINAL CONDITION <br />7. POT HOLE AND PATCH OVERALL SANITARY SEWER ONES. <br />B. POT HOLE AND PATCH OVER ALL WATER LINES/MAINS. <br />9. THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY D. <br />THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE <br />GUIDEUNES OF CVASCE 3B-02, ENTITLED STANDARD GUIDELINES FOR THE <br />COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTIUTY DATA. <br />ELECTRICAL CONDUCTOR SIZING: <br />THE FOLLOWING ASSUMPTIONS WERE MADE IN CALCULATING THE <br />PROPOSED ELECTRICAL CONDUCTOR SIZING: <br />240 VOLT SERVICE <br />SINGLE PHASE POWER <br />100A CIRCUIT <br />39S ALLOWABLE VOLTAGE DROP <br />CONDUCTOR WIRE SIZE: 3AWG <br />GC REQUIRED TO VERIFY WIRE SIZE WITH A MASTER ELECTRICIAN <br />• <br />a <br />CONSULTANT <br />Edge <br />GwrwNa .Prow.. Nye. <br />SON (PI INS vOICE <br />won e4ve�usk TemT <br />verizon <br />SET WAS PREPARED EV NE OR <br />UNDER IXT DIRECT SUPERVISION <br />OTHER THAN THE EXCEPTIONS <br />NOTED PI ENE SHEET MEX. AND <br />OUT IAN A CULT LICENSED <br />PROFESSIONAL ENGINEER <br />UNDO,. LANS OE /NE <br />STATE Of NEBRASKA_ <br />POWER SOURCE <br />IOLA CODE <br />PER <br />S17106 <br />42006 <br />FINAL <br />E-101 <br />EWE CONSULTING ENGINEERS. INC <br />