My WebLink
|
Help
|
About
|
Sign Out
Browse
202502301
LFImages
>
Deeds
>
Deeds By Year
>
2025
>
202502301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 11:42:14 AM
Creation date
5/1/2025 11:38:54 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202502301
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAKING SHEET- UNDERGROUND <br />Company: OPTK Networks Exchange: Beatrice <br />CONSTRUCTION PROJECT NOTES <br />1 The State. County. City perscnne) sham be notified a minimum of forty eignt (48) hours in advance of initial prowier <br />construction. <br />2. The utility company and the sontr dons i are responsible to nave at least one person on the job at all times, that is <br />'srze supervrsa' certifies <br />3 The contractor shall adhere to the current permit and contract specifications <br />4 The locations of all aerial aro underground utility facilities may not be indicated an the project plans. The contractor <br />is required to contact the Nebraska and Colorado 811 one car notification center Idol 811) forty-eight (48 i hours <br />poor to working in the city right of way No excavation wit be permitted in the area of the underground mitres until <br />all facilities have been located and identified to the satisfaction of all parties The contractor shall be responsible for <br />protection of al underground and aerial utilities and infrastructure. <br />Whenever underground facilities are in dose proximity to the proposed pathway location or whenever the vertical <br />location of the underground fealty is unknown. the contractor shall use speciar measures to determine the locations <br />of such underground facilities. <br />a If the contractor is conducting the excavaton by digging from Ow surface when in a close proximity m trio <br />underground fealties, the contractor shall use hand digging mydro excavating. or air excavating t ideate such <br />facility. <br />b. ff the contractor is conducting the excavation by tunneling or boring. the contractor shall determine trio vertical <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />utilities <br />0. Project plans snarl dimension new facilities being installed <br />7 Unless agreed to in writing in advance the depth of installed facilities in city and county row shall be at a minimum <br />as ouows- <br />a Forty-eight 148) Inches in son <br />b. Forty-eieft (48) inches below a projected s <br />vertical slope <br />c Flory -eight (48) inches under a roadway measured from the surface of sad roadway to the top or the instailahon <br />d. Sixty (00) inches under a sons water or creek channel design bottom or pipeand <br />e Maintain a minimum of twenty-four 124n inches of vertical and honzonta spacing from ex .sting utilities <br />f Be located as far from the existing or proposed curb line as possible to audio potential future canfkets <br />e As non -street surface matenals that are disturbed by excavation and backbiting operations snail be replaced and <br />restored <br />6. City and county street surface materials disturbed shall be beckfi8ed. tamped and repaved by City or county forces <br />or approved paving contractor <br />10 If sidewatwheel chair ramps or any portion of the pedestrian faceities are removed or closeda pedestrian detour <br />shall be established and maintained dunrg the time of the closure and the entire pedestrian facility snail be restored <br />within seventy-two 172i hours. unless the contractor provides a hard surface alternate route approved by the city or <br />county <br />11 At pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability <br />Act i ADA standards and specifications <br />12 At pedestrian demurs snail be part of an approved Traffic Control Plan ITCPl. <br />13 As holes made in the streets for the purpose of performing vacuum excavations to locate underground utikties snah <br />be restored to their original condition writ the reinstated core flush with and in the original orientation as the existing <br />surface matching existing pavement surface appearance <br />14 When the contractor is not actively working, all equipment, fencing, debris. etc. Shall not be placed within the <br />triangular area required for sight distance of vehicles exmng or entering an adjacent property or Intersection <br />At excavations shall be adequately fenced and covered when contractor is not present or project site left <br />unattended <br />ROW. line of a *ton at a three 131 horizontal and one 4 1 i <br />10 No lane closures allowed on arterial streets during AM and PM peak tours. <br />17 All work zone traffic control_ aaciudng pedestrian control measures, shall be in compliance setts ire MUTCD and <br />ADA <br />18. The contractor shall maintain a set of *as built" plans on see with dimensioning These plans shall be presented <br />upon request <br />16 Flu 'as -built' plans shalt be filed with city and: or county within 30 days of the completion of the project <br />20. The contractor shall follow construction standards pertain ng to the lateral corridor facility placement and minimum <br />depth requirements and clearance requirements of other facikoes. <br />21. A current State. County. or City permit shall be maintained on each work site by the contractor The contractor <br />snap present such permit upon request. <br />22 Any field adjustments to installation of facilitieswmcn vary from the plans that rave been submitted and approved <br />dung the permit application process. snail comply with the following, <br />a The contractor must stop work immediately and contact the facility owner of the proposed changes <br />b. The facility owners representative snail contact the city. county or state right-of-way construction inspector and <br />provide them with the details <br />c The ROW inspector wit make a oeterrmination on how to proceed. This determ:ration may range from approval <br />over the phone or via email to delaying the project until plans can be updated and appropriate review can be <br />conducted <br />23. Stake mounted warning signs and marker posts (BM53) to be placed where appropriate. <br />24 All conduit and abet is to be installed at the bade of the roadway ROW unless otherwise noted. <br />25. Leave 120' loops (00' tars at splice points) for mainline fiber in vaults <br />
The URL can be used to link to this page
Your browser does not support the video tag.