Laserfiche WebLink
Phase 1 would be <br />installing <br />approximately 500' of <br />4" to get to the <br />corner. Water is <br />currently in & we <br />would be at least 3' S <br />of the water main. <br />Phase 2 would be <br />installing the <br />remaining of the 4" <br />after paving of the <br />road is done. <br />City of Grand Island Utilities Department <br />Approximate total of <br />4" PI Pipe = 3400' <br />A/I4ih'.1-"ei^- 2144Iii114 <br />Print Date: 11/6/2024 <br />