Laserfiche WebLink
202405608 <br />Stat. 76-2301 et seq. <br />Must maintain a minimum three (3) foot horizontal separation if paralleling water mains, as well as minimum one (1) foot vertical separation at water main <br />crossings. Please contact Utilities Engineering (308-385-5463) when planning to connect to existing gas main in Root St so current alignment <br />can be verified. <br />Must maintain minimum three (3) foot separation from electric utility primary. <br />The proposed facilities or their operation or their maintenance shall not unreasonably interfere with the facilities or the operation or maintenance of the facilities <br />of other persons, firms or corporations previously issued permits of use and occupancy, and the proposed facilities shall not be dangerous to persons or <br />property using or occupying the roadway or using facilities constructed under previously granted permits of use and occupancy; and that the City's records of <br />prior permits are available, it being the duty of the applicant to determine the existence and location of all facilities within the City right-of-way/easement. <br />5. RESTORATION OF PROPERTY. If the construction or maintenance of the installation/improvement identified in Paragraph 1 above requires the excavation <br />of earth, removal of hard surfacing, grass, vegetation, landscaping, or any other disruption of the surface of the public right-of-way/easement or neighboring <br />property, the Permittee shall restore the surface of the area to the same condition as it existed immediately prior to the Permittee's work in the area. <br />Drainage in roadway side and cross ditches must be maintained at all times. The entire right-of-way/easement affected by work under a permit must be <br />restored to as good a condition as existed prior to beginning work to the complete satisfaction of the City Engineer. <br />6. EFFECTIVE DATE. This Right-of-Way/Easement Utility Permit shall take effect on the date it is executed by the Public Works Director/City Engineer of the <br />City of Grand Island as dated below. tt shalt continue for an indefinite term or until such time as it is terminated as provided hereafter. <br />7. TERMINATION. This Right-of-Way/Easement Utility Permit shall terminate upon one or more of the following occurrences: <br />(a) The service of sixty (60) days written notice of intention to terminate by any party upon the other party. If there is a valid Franchise Agreement <br />between the Permitor and Permitee, the termination provisions in that agreement shall supersede. <br />(b) The Permittee's application for a permit to alter said improvement or any part thereof, unless said permit is for work due to an occurrence as <br />described in Paragraph 3 above and said work has the prior written approval of the Permitor. <br />(c) The Permittee's construction or installation of any structure or improvement of any nature upon the City's property, public right-of-way, or easement <br />owned by the Permitor except that described in Paragraph 1 above. <br />Upon the termination of this Right-of-Way/Easement Utility Permit, the Permittee shall be required, and hereby agrees, to remove said improvement from the <br />Permitor's property at its own expense and without cost to the Permitor. Said removal to occur no later than sixty (60) days after receipt of the notice of <br />intention to terminate or any of the occurrences set forth in Paragraph 7 above. Should the Permitee fail to do so, the Permitor may remove or cause the <br />removal of said improvement from the Permitor's property and the Permittee agrees to reimburse the Permitor for all its costs. <br />8. SUCCESSORS AND ASSIGNS. This permit shall be binding upon the parties hereto, their successors and assigns. <br />9. ENTIRE PERMIT. This Right-of-Way/Easement Utility Permit constitutes the entire permit between the parties notwithstanding any other oral or written <br />permits to the contrary. This Right-of-Way/Easement Utility Permit shall be amended only in writing executed by all parties hereto. <br />10. CHOICE OF LAWS. This Right-of-Way/Easement Utility Permit shall be construed in accordance with the laws of the State of Nebraska and the City of <br />Grand Island, Nebraska. The rights and privileges granted herein shall be nonexclusive and shall not be construed to be any broader than those expressly set <br />out in City Code or State Law, regardless of the language used in this permit and that any facilities placed on City right-of-way/easement shall be placed in <br />accordance with existing laws and the standards of the City. <br />11. CONTENT OF LANGUAGE. Wherever the context of the language in this Right-of-Way/Easement Utility Permit is appropriate, the singular shall apply to <br />the plural and the plural shall apply to the singular. <br />