Laserfiche WebLink
202405247 <br />EXHIBIT "A"- <br />io-j aoay <br />Fa.", erect 4 sew ee s <br />City of Grand Island- Public Works Department (Permit Requirements for Great Plains) 3333 Fs:d ky At <br />1. Fiber/Vaults will be placed at back of right of way. <br />2. Locates will determine exact placement of Fiber/Vaults <br />3. Vaults will not be placed in the flowline of the ditch. <br />4. The finished grade of vaults will match the slope of ditch embankment. <br />5. All flowlines will be restored to the same after construction is completed. <br />6. Any excavation near open ditches shall have erosion control fencing. <br />7. Contractor will obtain a permit to work in city right of way. Including traffic control plan. <br />8. All Locate flags will be pulled after construction is completed. <br />9. We will stay 3'Ft away from underground power lines. <br />10. Fiber placement will stay S'ft from base of any traffic cabinets, signal poles and traffic pull boxes. <br />11, If Great Plains fiber must cross any signal conduits, we will stay 6'ft cleep under conduits. <br />12. All existing conduits will he potholed. <br />