ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of forty eight (48) hours m advance of initial project construction. <br />2. The contractor shall adhere to the current City standard specifications, approved special provisions, City standard plans, right-of-way construction <br />procedures manual. <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One <br />Call 811 notification center (dial 811) forty-eight (48) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall he responsible for <br />protection of all underground and aerial utilities and infrastructure. <br />4. Whenever underground facilities are m close proximity to the proposed pathway location or whenever the vertical location of the underground <br />facility is unknown the pen.. shall use special measures to determine the locations of such underground facilities. <br />a If the pemitee is conducting the excavation by digging from the surface, when in a close proximity to the underground &cilium, the permittee <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locate such facility. <br />b. If the permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. <br />5. Project plain shall dimension new facilities being installed. Measurement. shall be taken from existing adjacent visible structures (curbs, poles, <br />cabinets, manholes, inlets, fire hydrants, etc.) clearly identifying location of such facility. The contractor shall verify dimensions taken from city files. <br />6. Unless specified on the plan seta, the depth of installed facilities in city row sh 1 be at a minimum as follows. <br />a. Thirty-two (32) inches in soil, if rock present and is an issue twenty-four (24) inches can be used <br />b. Forty-two (42) inches below a projected slope from the Bow line of a ditch at a three (3) hororontal and one (1) vertical slope. <br />c. Forty-eight (48) inches under a roadway measured from the surf of said roadway to the top of the imrdlariot. <br />d Forty-eight (48) inches under a storm water or creek channel design bottom of pipe, and <br />e. Maintain a minimum of twenty-f (24) inches of vertical and horizontal spacing from existine utilities. <br />f Be located as fat from the existing or proposed curb line as possible to avoid potential fume conflicts. <br />7. All potholes m sidewalk panels will be filled unless directed by City inspector. If colored, textured or patterned concrete is existing, replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs prior to <br />starting work <br />8. All non -street surface materials that are disputed by excavation and backf111ing operations shall be replaced and restored <br />9. City street surface materials disturbed shall be bankfilled, tamped and reproved by city forces or approved paving contactor. <br />10. All Conduit, vaults and Pedestals shall be located in the public ROW and in public utility easements. <br />11. All Aerial shown on attached Name will be permitted separately by Pole Owners. All pole permits submitted to pole owners will follow <br />NESC codes. <br />SPB.cU11ry6ktluit shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension Is available at all locations. <br />4. The contractor shall bypass all MST pedestals with dissnbubon conduit where installed parallel to MST conduit Similarly, <br />bypass the T18 'Flowerpot' with MST conduit where installed parallel to future drop conduit. <br />12. t sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />contractor provides a hard surface alternate route approved by the city <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet anent Americans with Disability Act (ADA) standards and <br />specifications. <br />14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />their original condition with the reinstated core gush with and In the original orientation as the existing surface matching existing pavement <br />surface appearance. <br />16. When the contractor is not actively working. all equipment, fencing, debris, etc, shall not be placed within the triangular area required for <br />sight distance of vehicles exiting or entering an adjacent property or intersection. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />aeration(.) staff. <br />19. All work zone traffic control, Including pedestrian control measures, shall be in compliance with the MUTCD, ADA, and the City Standard <br />Specifications. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />22. The contactor shall maintain a set of 'es built' plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />23. A anent dry right of way construction pert, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locate flags after work is complete. <br />25. My field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application p asc, shall comply with the following: <br />a. The contractor must stop work immediately and contract the facility owner. <br />b. The facility owner', representative shall contact the dty's construction inspector and provide him with the details of the proposed <br />changes. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or vise <br />mail to delaying the project until plans can be updated and appropriate review can be conducted. <br />26. Crossing City of Grand Island Track Signal Infrastructure <br />a. Conduit shall not be placed between Citys Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />conduit around the Citys Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held ensile with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />b. Conduit shall be offset a minimum of FNe (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />because of physical constraints, a meeting will be held rmste to determine the best accommodation which may result In less than the <br />desired 5' of offset. <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified on - <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting oil be held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />a1111•110 <br />11eaFItl1 <br />8:1 <br />dianthus mai <br />tw. haa� •saaxn r:v tas;rn <br />AIMOVINIATIO,S. 1. <br />:varEt.CONTIV.7014,0174.14711,,,II ASV <br />raltirliA[ti WOK AND MID. <br />Alto <br />A <br />2S6i0tL06 <br />