My WebLink
|
Help
|
About
|
Sign Out
Browse
202404310
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202404310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 2:16:09 PM
Creation date
9/5/2024 2:13:07 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202404310
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />ramps y portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />1. The City shall be notified a minimum of forty eight (48) home in advance of initial project mnsmmti°n. 12. If sidewalk, wheel chair ramor an <br />and maintained during the time of the closure and the entire pedesbian facility shall be restored within seventy-two (72) hours, unless the <br />2. The contractor shall adhere to the current Ciry standard specifications, approved special provisions, City standard plow, right-of-way ewswctioo conhador provides a hard surface alternate route approved by the city. <br />procedures manual. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plaru. The contactor is required to contact the One speclfcaoons. <br />Call 811 notification center (dial 811) forty-eight (48) hours prior to working in the city right of way. No excavation will be permitted in the arca of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shag be responsible for 14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground facilities are m close proximity to the proposed pathway location or whenever the vertical location of the underground their original condition with the reinstated core flush with and In the original orientation as the existing surface matching existing pavement <br />facility is unknown, the pertain. shall use special measures to determine the locations of such underground facilities. surface appearance. <br />a. If the nominee is conducting the excavation by digging from the surface, when in a close proximity to the underground facilium, the permittee 16. When the contractor is not actively working, all equipment, fencing, debris, etc, shall not be placed within the triangular area required for <br />shag use hand digging, hydro excavating, ah excavating, or any other techniques that are approved by the City to locate such facility. sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. Utile a rmine< u conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />facility by potholing or my other method approved by the City. 17. All excava8ons shall be adequately fenced and covered when contractor is not present or project she left unattended. <br />5. Project plans shall dimension new facilites being installed. Measurements shag be taken from existing adjacent visible structures (curbs, poles, 18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets, fire hydrants, etc.) clearly identifying location of such facility. The conned°, shag verify dimensions taken from city files. section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed facilities in city row shag be at a minimum es follows. 19. All work zone traffic control, Including pedestrian control measures, shall be in compliance with the MUTCD, ADA, and the City Standard <br />Specifications. <br />a. Thirty-two (30) inches in soil, if rock present and ram issue twenty-four (24) inches can be used. <br />20. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of conshucnon <br />b. Fury -two (42) inches below a projected dope from the flow Luse of a ditch at a three (3) horizontal and one (1) vertical slope. and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />c. Forty-eight (48) inches under a roadway measured from the surf of said roadway to the top of the installation. 21. The contractor shall maintain a set of *as built' plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />d Forty -right (48) inches under • storm water or creek channel design bottom of pipe, and <br />22. A current city right of way construction permit and city approved plan set shall be maintained on each work site by the contractor. <br />0. Maintain a minimum of twenty -f (24) inches of verttical and horizontal spacing from existing utilities. contractor shall present such permit and plan set upon request to any city representative. <br />The <br />f Be located as far from the existing or proposed curb line as possible to avoid potential future conflicts. 23. Any field adjustments to Installation of fadlitles, which vary from the plans that have been submitted and approved during <br />application process, shall comply with the following: <br />the permit <br />7. All potholes in sidewalk panels wig be filled unless directed by City inspector. If colored, textured or patterned concrete is existing, replacement a. The contractor must stop work immediately and contract the facility owner. <br />patches, and panels panels will be replaced to march as <br />starting work. <br />8. All noo-stteet surface materials that are disturbed by <br />practicable. Owner may be required to put money into escrow to cover all repairs prior to <br />b. The facility owner's representative shall contact the drys construction inspector and provide him with the details <br />excavation and backfilling operations shall be replaced and restored. <br />of the proposed changes. <br />9. City sheet surface mneriaks disturbed shall be backfilled, tamped and repaved by city forces or approved paving contractor, <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or via <br />10. Alt Conduit, vaults and Pedestals shag be located in the public ROW and in public utility easements. email to delaying the project until plans can be updated and appropriate review can be conducted. <br />11. All Aerial shown on attached plenset will be permitted separately by Pole Owners. All pole permits submitted to pole owners will follow <br />NESC codes. <br />Special Notes <br />1. All conduit shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on aU private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />4. The contractor shall bypass all MST pedestals with dlstrkbutIon conduit where Installed parallel to MST conduit Similarly, <br />bypass the T18'Flowerpot' with MST conduit where installed parallel to future drop conduit <br />ebraska 8�� <br />Know what's below. -.10,- <br />811 before you dig. <br />Allo <br />N <br />A <br />FIBER <br />PAGE 2of16 <br />Ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.