Laserfiche WebLink
ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of ferry eight (48) hours in advance of initial prgea comwctioo. <br />12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained dunng the time of the dosure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />2. The contractor shall adhere to the current City mndard specifications, approved special provisions, City standard plans, nght-of--way cooausa:tion <br />procedures manual. <br />contractor provides a hard surface altemale route approved by the city. <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One <br />13. All peonsman detours and any reconstruction of pedestrian facilities shall meet arrant Americans with Disability Act (ADA) standards and <br />Call 811 notification center (dial 811) forty-eight (48) hours to working the city t of way. No excavation Will be permitted in the area of <br />prior eking in ry righ Y <br />specifications. <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible for <br />14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All hales made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or whatever the vertical location of the underground <br />their original condition with the reinstated core lush with and in the original orientation as the existing surface matching existing pavement <br />facility is unknown, the pemiaee shall use special measures to determine the locations of such underground facilities. <br />surface appearance. <br />a 17 the permittee is conducting the excavatinn by digging from the earl , when in a close proximity to the underground fecilihes, the ...Mt. <br />16. When the contractor is not actively working. ell equipment, fencing, debris, etc, shall not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locate such facility. <br />sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. 17 the permittee is cooductiog the excavatiou by =riding or boring, the penalttee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shag dimension new facilities being hustled. Measurements shall be taken from existing adjacent visible structures (curbs, poles, <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic end Right of Way Construction <br />cabinets, manholes, inlea, fire hydrants, etc.) clearly identifying location of such facility. The contractor shall verify dimensions taken from city files. <br />section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed facilities in city row shall be at • minimum as follows. <br />19. All work zone traffic control, including pedestrian control measures, shall be in compliance with the MUTCD, ADA, and the City Standard <br />a Thirty-two (30) inches m soil, if rock pre..t and is an issue twenty-four (24) inches can be used <br />Specifications. <br />20. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />b. Forty-two (42) inches below a projected slope from the flow line of a ditch sta duce (3) horizontal and one (1) vertical slope. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />c. Forty-eight (48) inches under a roadway measured from the surface of said roadway to the top of the mstalladon. <br />21. The contractor shall maintain a set of 'as built' plans on she with dimensioning. These plans shall be presented upon request to any dry <br />representative. <br />d Forty-eight (48) inches under a stem water or creek channel design bottom of pipe, and <br />22. A current dry right of way construction permit and dry approved plan set shall be maintained on each work site by the contractor. The <br />e. Maintain a minimum of twenty-four (24) inches of vertical and horizontal spacing from existing utilities. <br />contractor shall present such permit and plan set upon request to any city representative. <br />7 Be loaned as far from the existing or proposed curb line as possible to ovoid potential future conflicts. <br />23. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process. shalt comply with the following: <br />7. All potholes m sidewalk panels will be filled unless directed by City impncmr. If colored, texmrcd or patterned cooerete is existing, replacement <br />a. The contractor must stop work immediately and contract the facility owner. <br />patches, and panicle panels will be replaced to match as practicable. Owner maybe required to put money into arrow to cover all repairs prior to <br />starting work. <br />8. All non-street sale materials this are disturbed by excavation and backfilling operations shall be replaced and restored. <br />b. The facility owner's representative Shall contact the city's construction Inspector and provide him with the details <br />of the proposed changes. <br />9. City streetdisturbed surface materials disrbed shall be backfilled, gimped and repaved by city forces or approved paving contractor. <br />10. All Conduit, veins and Pedestals shall he located in the tike ROK' and in public utility tic <br />pia ty e0seme0 <br />e. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or via <br />email to delaying the project until plans can be updated and eppropnate review can be conducted. <br />11. All Aerial shown on attached ptanset will be permitted separately by Pole Owners. All pole permits submiued to pole owners wig follow <br />NESC codes. <br />Special Notes <br />1. All conduit shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, Nus dimension is available at all locations. <br />4. The contractor mall bypass l MST pedestals with distribution conduitwhere Installed parallel to MST conduit.conduit.Similarly. <br />bypass the T18'Flowerpot' with MST centluil where installed parallel to future drop conduit <br />+ <br />atiraska 8:1 <br />Know what's below. <br />811 before you dig. <br />Allo <br />N <br />FIBER <br />PAGE 2 of 15 <br />