Laserfiche WebLink
ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of forty eight (48) hours in edveace of initial project construction. <br />12. 8 sidewalk, wheel chair rams or any y portlon of the pedestrian facilities are removed or closed. a pedestrian detour shell be established <br />and maintained during the time of the closure and the entire pedestrian facility shell be restored within seventy-two (72) hours, unless the <br />2. The contractor shag adhere to the curets City standard specifications, approved special provisions, City standard plans, right -of --way construction <br />procedures manual. <br />contractor provides a hard surface alternate route approved by the city. <br />13. AN pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards <br />3. The locations of all aerial and 00010900004 utility facilities may not be indicated on the project plana. The contractor is 0110004 to contact the One <br />and specifications. <br />Call 811 oodficatioo center (dial 811) forty -right (48) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all ficilitim have bee, located and identified to the satisfaction of all parties. The contractor shall be responsible for <br />14 Al pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all u,dergrouod and aerial utilities and infrastructure. <br />15 All hobs made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground figties are m close proximity to the proposed pathway location or whenever the vertical location of the underground <br />their original condition with the reinstated core flush with and In the original orientation as the existing surface matching existing pavement <br />facility is unknown, the permittee shall use special measures to determine the locati011s of such underground facilities <br />surface appearance. <br />a. If the permittee is conducting the excavation by digging from the surface, when in a close proximity to the underground facilities, the permittee <br />16. When the contractor is not actively working, all equipment, fencing, debris, etc, shall not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locate such facility. <br />sight distance of vehicles exiling or entering an adjacent property or intersection. <br />b. If the permittee is conducting the excavation by tunneling or boring, the permitter shall determine the vertical location of the underground <br />facility by potholing or any otter method approved by the City. <br />17. AA excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed Measurements shall be taken from existing adjacent visible sum.. (curbs, poles, <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way <br />cabinets, manholes, inlets, fire hydrants, etc.) clearly identifying location of such facility. The contractor shag verify dimensions taken from city files. <br />Construction section(s) staff. <br />6. Unless specified on the plan seta, the depth of installed facilities in city row shag be ata minimum as follows. <br />19 AN work zone traffic control, Including pedestrian control measures. shall be In compliance with the MUTCD, AD& and the City Standard <br />Specifications. <br />a. Thirty-two (32) inches m soil, if rock present and is so issue twenty-four (24) inches can be used <br />b. Forty-two (42) inches below a projected slope from the flow line of a ditch at a ihme (3) horizontal and one (1) vertical slope. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of <br />c. Forty-eight (48) inches under a roadway measured from the surf of said roadway to the top of the installation. <br />construction and provide updates to the effected owners when construction phases change that affect the areas of work associated with the <br />permit. <br />d. Forty-eight (48) inches undo a storm water or creek channel design bottom of pipe, and <br />0. Maintain a minimum of twenty-four (24) inches of vertical and I ..res l awing from existing utilities. <br />22. The contractor shall maintain a sal of "as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />E Be located or far from the existing or proposed nub line as possible to avoid potential future conllica. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />the contractor. The contractor shall present such permit and pian set upon request to any city representative. <br />7. All potholes m sidewalk panels will be filled moleso directed by City inspector. Ifcolored, textured or panned concrete is existing, replaoment <br />24 The contractor shall remove locate flags after work is complete. <br />patches, and panels panels will be replaced to nmch ea practicable. Owner may be required to put money into escrow to cover all repairs prior to <br />starting work. <br />25 Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process, shall comply with the following: <br />8. Al) non -street surface materials that are disturbed by excavation and backfilling operations shall to, replaced and restored. <br />a. The contractor must stop work Immediately and contract the facility owner. <br />9. City street surface materials disturbed shall be backfilled, tamped and repaved by city forces or approved paving contractor. <br />b. The faG8y owner's representative shall contact the Guy's construction Inspector and provide him with the details of the proposed <br />10. All Conduit, vaults and Pedestals shall be located in the public ROW and in public utility easements, <br />changes. <br />el <br />Ant <br />IININIs1 <br />11. All Aerial shown on attached planset will be permitted separately by Pole Owners. All pole permits submitted to pole owners will follow <br />NESC codes. <br />e. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />mail to delaying the project until plans can be updated and appropriate review can be conducted. <br />811 <br />Special Notes <br />26. Crossing City G Grand Island Traffic Signal Infrastructure - <br />'Mee'Wew' IV <br />E.i/salsa�t <br />1. All conduit shall be bored unless specified otherwise. <br />a. The Grand Island Streets Division shaN be contacted prior to work beginning at 308-385-5322. Any keyhole potholing locations in the <br />2. Contractors shall notify land owner prior to work on all private developments. <br />roadway shall be approved by the Streets Division and shall be fiNed within five days of potholing. <br />"` <br />°'""' <br />3 A reminder to the reader. the drawings are aceled, thus dimension is available at ell bcetions. <br />b. Conduit shall not be placed between City. Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route <br />the conduit around the Cltys Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />-.- <br />4. The contractor shall bypass all MST pedestals with distribution conduit where Installed parallel to MST conduit. Similarly, <br />bypass the 718 "Flowerpot with MST conduit where installed parallel to future drop conduit. <br />meeting will be held onsite with the contractor, city, and ALLO to delernine the best conduit alignment between these structures. <br />c. Conduit shall be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. <br />' <br />_ <br />- -- <br />5. No handholds or vaults shall be placed in the flowllne or sloped bank of drainage ditches. If it has to be placed on sloped <br />8 Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull <br />bank the final grade of hand hold or vault lid shall match that of the sloped bank. <br />box because of physical constraints, a meeting will be held ons6e to determine the best accommodation which may result in less than <br />the desired 5' of offset. <br />6. Erosion control shall be in place for all open excavations adjacent to drainage ditches. All drainage ditch flowlines must be <br />restored before job is done. <br />d. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified <br />onsite before boring. 8 unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will be held onsite <br />between the Gy, contractor, and ALLO to determine the best oondu8 alignment that may be less than 6' deep. <br />7 No handholds, vaults, or manholes shall be placed In the ADA accessible area of the sidewalk. <br />e. Locate flags shal be removed after the "excavator has determined the work Is complete. <br />8 Any sidewalk removals & replacements shall be approved by the Gland Island Streets Division prior to removal. Restoration <br />of sidawe16 shall be done within 5 days of removal <br />f. IF SIGNAL CONDUfTIWIRE HAS TO BE CROSSED THE NEW LINE SHALL BE A MINIMUM OF 6' DEEP WHERE CROSSING AND <br />THE EXISTING SIGNAL CONDUIT SHALL BE POTHOLED AND VERIFIED ON-SITE PRIOR TO BORING <br />Allo <br />N <br />A <br />