Laserfiche WebLink
D/W - CONCRETE <br />W STATE ST - CONCRETE <br />BF024 <br />XD,1-2 <br />FIBER,3-24 <br />BF048—*, <br />FIBER,1-2 <br />XD,3-48 <br />MH 168C <br />40.93874, -98.38818 <br />x <br />EXISTING 13e DUCT <br />D/W TO MENARDS - CONCRETE <br />BF048 <br />FIBER,1-2 <br />XD,3-48 <br />NOTE: HANDHOLE MIGHT NEED TO BE PLACED <br />ON TOP OF THE BF024. THIS CABLE WAS <br />LOCATING AT A DEPTH OF 5W SOUTH OF THE <br />EXISTING HANDHOLE <br />i'. Y ................. <br />t__ <br />HH WSEL1 <br />40.93834,-98.38818 MOVE EXISTING HANDHOLE & BF048 SOUTH 30' <br />USE EXISTING SLACK LOOP IN HANDHOLE <br />SPLIT DUCT NEEED PER STEVEN TULLOS <br />x <br />BF024 <br />FIBER,1-24 <br />WBM27(E)48=30 <br />SPEL11(F)=6 <br />SPEL17(F)=2 <br />BM2F=1 <br />FTBB: <br />AWGF: <br />JOB DESCRIPTION: RDMV361668 - <br />PHASE 1 CLAUDE ROAD - STATE ST <br />GRAND ISLAND, NE <br />TAX DISTRICT: <br />REQUESTED BY: <br />0001 <br />PROJECT MANAGER: <br />CUSTOMER OTHER CONTACTS: <br />KATIE LI NN - OLSSON 913-424-7732 <br />MATT LAY - DIAMOND 308-850-3120 <br />WORK ORDERN:49400074940001 <br />DATE: 4/5/2024 <br />EXCHANGE: <br />DISCTRICT: <br />GDIS <br />CUT SHEETS REQ. N <br />OPERATIONS MANAGER: <br />CIRCUIT ID: <br />ENGINEER: CHRIS KOCH <br />PHONE 8: 402-560-4491 <br />REVISIONS: <br />PERMIT REQ. Y <br />REVISION DATE: <br />SHEET 2 OF 3 <br />MOP REQ. N <br />JOINT WORK REQ. N <br />r) kinetic <br />from windstream' <br />