My WebLink
|
Help
|
About
|
Sign Out
Browse
202403154
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202403154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:53:55 PM
Creation date
7/10/2024 2:51:57 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202403154
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
()-PLACE NEW HANDHOLE NORTH OF SIDEWALK; ()REMOVING MH168 <br />BACK OF THE ROW MANHOLE 15 4'X6'X8' CONCRETE VAULT <br />-REMOVE & REPLACE 2 SIDEWALK PANELS REMOVE & RETURN EXISTING FOSC TO WINDSTREAM <br />-DIG & SWING EXISTING 72F & DUCTS <br />-PLACE FOSC & SPLICE ACCORDINGLY P.S. PRICING FOR REMOVAL <br />WHUO=1 <br />BHF(24X36X24)T=1 <br />BM2F=1 <br />BM73F=40 <br />W BM 27(E)48=75 <br />H8F0(144)=1 <br />HO1(B)=62 <br />WHO1(B)=10 <br />HOMW(B)=10 <br />KDL CHILD CARE <br />3704 W 13TH ST <br />ROW <br />SIDEWALK <br />X <br />REMOVE THIS CABLE AFTER -104 <br />NEW CABLE HAS BEEN PLACED, <br />TESTED & TURNED UP <br />XXU0=750 <br />(3) 1.25" DUCTS <br />O <br />UU <br />CURB <br />-C/L- <br />U072 <br />FIBER,1-4 <br />XD,5-6 <br />FIBER,7-12 <br />XD,13-14 <br />FIBER,15-22 <br />XD,23-24 <br />FIBER,25-26 <br />XD,27-30 <br />FIBER,31-32 <br />XD,33-36 <br />FIBER,37-38 <br />XD,39-44 <br />FIBER,45-46 <br />XD,47-72 <br />CURB <br />U0144 725' <br />FIBER,1-4 <br />XO,5-6 <br />FIBER,7-72 <br />XD,73-144 <br />ROW <br />U <br />O <br />U072 -00 <br />XD,1-32 <br />FIBER,29-30 <br />XD,35-72 <br />NOTE TO CAD/E: <br />MH168 WILL BE <br />REMOVED <br />IA <br />SHEET 4 <br />Rmc <br />U <br />CONCRETE <br />PARKING <br />LOT <br />-A NEW STORM SEWER LINE IS BEING PLACED <br />HERE @ STA 317+35 <br />-WE NEED TO DIG UP & EXPOSE OUR EXISTING <br />(3) 1.25" DUCTS & REPLACE THEM IN BETWEEN <br />MH168 & MH168A (ON SHEET 3) TO AVOID THIS <br />NEW STORM SEWER LINE <br />-DUCTS ARE ENCASED IN A 4" CONDUIT WHICH <br />IS ENCASED IN CONCRETE <br />W BM27(E )48=40 <br />BM73F=80 <br />UD(3X1.25)V=700 <br />NEW STORM SEWER <br />LINE @ STA 317+35 <br />U024 1000' <br />FI BE R,5-6 <br />XD,3-24 <br />ZD <br />0 \ XXU0=400 <br />(3) 1.25" <br />• DUCTS NORTH <br />REMOVE THIS <br />CABLE AFTER <br />NEW CABLE <br />HAS BEEN <br />PLACED, <br />TESTED & <br />TURNED UP <br />U072 <br />FIBER,1-4 <br />XD,5.6 <br />FIBER,1-12 <br />XD,13-14 <br />FIBER,15-22 <br />XD,23-24 <br />FIBER,25-26 <br />XD,27-30 <br />FIBER,31-32 <br />XD,33-36 <br />FIBER,37-38 <br />XD,39-44 <br />FIBER,45-46 <br />XD,47-72 <br />NOTE TO CAD/E: <br />ABANDON THIS <br />DUCT IN PLACE <br />(1)1.25" DUCT <br />() ACCESS EXISTING FOSC IN MH167 <br />SPLICE IN NEW CABLES <br />UM2C=2 <br />WHUO=1 <br />HO1(U)=60 <br />WHO1(U)=12 <br />HOMW(U)=12 <br />() 3 SIDEWALK PANELS NEED <br />TO BE REMOVED -REPLACED <br />TO MAINTAIN RUNNING LINE <br />IN PUBLIC ROW <br />BM73F=60 <br />SEC 12 <br />TN 11N <br />RNG lOW <br />PULL IN NEW 24F CABLE <br />FROM MH167 TO MH168A (ON SHEET 3) <br />U0241=1000 <br />I z <br />0 <br />MH168 <br />(3) 1.25" DUCTS REMOVE THIS CABLE AFTER I <br />NEW CABLE HAS BEEN PLACED, PULL IN NEW 144F CABLE <br />(3) 1.25" <br />DUCTS WEST <br />(6) 1.25" DUCTS <br />EXPOSE EXISTING 72F <br />& DUCTS EAST 60' <br />TESTED & TURNED UP <br />XXU0=425 <br />O <br />..-..-a rrrA� •- X � •• J �cp. mss,.-. <br />OLVIU <br />CURB <br />40' <br />BORE 300' FROM MH167 TO MH 168 <br />1T�Hf _ 8U 6 DUCTS WILL BE COUPLED <br />-c-/E- <br />FROM <br />b- <br />FROM MH167 TO NEW HH168 T TO EXISTING 3 DUCTS NORTH & 3 <br />DUCTS WEST <br />CURB BM60(6)(1.25)PF>100=300 <br />-ROW <br />r <br />-ROW- - <br />SIDEWALK <br />e CURB - <br />UO144I=725 <br />CURB <br />\-; --� \- <br />SIDEWALK <br />I° <br />n <br />ROW <br />FTBB: <br />AWGF: <br />TAX DISTRICT: <br />REQUESTED BY: <br />JOB DESCRIPTION: RDMV361668 - <br />PHASE 3 CLAUDE ROAD - STATE ST <br />GRAND ISLAND, NE <br />0001 <br />PROJECT MANAGER: <br />CUSTOMER OTHER CONTACTS: <br />KATIE LINN -OLSSON 913-424-7732 <br />MATT LAY - DIAMOND 308-850-3120 <br />WORK ORDER#: 749442006 <br />DATE: <br />6/12/2024 <br />EXCHANGE: <br />DISCTRICT: <br />GDIS <br />OPERATIONS MANAGER: <br />CIRCUIT ID: <br />ENGINEER: CHRIS KOCH <br />PHONE K: 402-560-4491 <br />REVISION#: <br />CUT SHEETS REQ. <br />PERMIT REQ. <br />N <br />V <br />REVISION DATE: <br />SHEET 3 OF 4 <br />MOP REQ. <br />Y <br />JOINT WORK REQ. N <br />SEC 13 <br />TN 11N <br />RNG lOW <br />kinetic <br />from windstream' <br />
The URL can be used to link to this page
Your browser does not support the video tag.