Laserfiche WebLink
202402510 <br />Permittee is responsible for submitting an approved traffic control plan prior to commencement of any work Locate nags shall be removed after the <br />''excavator"has determined the work is complete. <br />Permittee shall coordinate any and all work with the City of Grand Island, their consultant', and contractor eliminate any interference with known/marked <br />City utilities. Any interference with City utilities shall be addressed immediately and at the expense of the Permittee. <br />4. PROTECTION OF EXISTING UTILITIES. The Permittee is responsible for locating and coordinating original construction and future maintenance <br />work on the described installation/improvement. No excavation work will be permitted in the area of underground utility facilities until all <br />such facilities have been located and identified to the satisfaction of all parties. The excavation must be done with care in order to avoid any <br />possibility of damage to the utility facility. The Permittee shall be responsible for any and all damages, except to the extent that such <br />damaged facility failed to comply with the requirement of Neb. Rev. Stat. 76-2301 et seq. <br />Must maintain a minimum three (3) foot horizontal separation if paralleling water mains, and also a minimum one (1) foot vertical separation must be <br />maintained at water main crossings. Coordination with Utilities Engineering must occur by calling 308-385-5463 prior to installation. <br />A minimum three (3) foot clearance from electric utility primary must be maintained. <br />The proposed facilities or their operation or their maintenance shall not unreasonably interfere with the facilities or the operation or <br />maintenance of the facilities of other persons, firms or corporations previously issued permits of use and occupancy, and the proposed <br />facilities shall not be dangerous to persons or property using or occupying the roadway or using facilities constructed under previously <br />granted permits of use and occupancy; and that the City's records of prior permits are available, it being the duty of the applicant to <br />determine the existence and location of all facilities within the City right-of-way/easement. <br />5. RESTORATION OF PROPERTY. If the construction or maintenance of the installation/improvement identified in Paragraph 1 above requires the <br />excavation of earth, removal of hard surfacing, grass, vegetation, landscaping, or any other disruption of the surface of the public right-of- <br />way/easement or neighboring property, the Permittee shall restore the surface of the area to the same condition as it existed immediately <br />prior to the Permittee's work in the area. <br />Drainage in roadway side and cross ditches must be maintained at all times. The entire right-of-way/easement affected by work under a <br />permit must be restored to as good a condition as existed prior to beginning work to the complete satisfaction of the City Engineer. <br />6. EFFECTIVE DATE. This Right-of-Way/Easement Utility Permit shall take effect on the date it is executed by the Public Works Director/City <br />Engineer of the City of Grand Island as dated below. It shall continue for an indefinite term or until such time as it is terminated as provided <br />hereafter. <br />7. TERMINATION. This Right-of-Way/Easement Utility Permit shall terminate upon one or more of the following occurrences: <br />(a) The service of sixty (60) days written notice of intention to terminate by any party upon the other party. If there is a valid Franchise <br />Agreement between the Permitor and Permitee, the termination provisions in that agreement shall supercede. <br />(b) The Permittee's application for a permit to alter said improvement or any part thereof, unless said permit is for work due to an <br />occurrence as described in Paragraph 3 above and said work has the prior written approval of the Permitor. <br />(c) The Permittee's construction or installation of any structure or improvement of any nature upon the City's property, public right-of- <br />way, or easement owned by the Permitor except that described in Paragraph 1 above. <br />Upon the termination of this Right-of-Way/Easement Utility Permit, the Permittee shall be required, and hereby agrees, to remove said <br />improvement from the Permitor's property at its own expense and without cost to the Permitor. Said removal to occur no later than sixty (60) <br />days after receipt of the notice of intention to terminate or any of the occurrences set forth in Paragraph 7 above. Should the Permitee fail to <br />do so, the Permitor may remove or cause the removal of said improvement from the Permitor's property and the Permittee agrees to <br />reimburse the Permitor for all its costs. <br />8. SUCCESSORS AND ASSIGNS. This permit shall be binding upon the parties hereto, their successors and assigns. <br />9. ENTIRE PERMIT. This Right-of-Way/Easement Utility Permit constitutes the entire permit between the parties notwithstanding any other oral <br />or written permits to the contrary. This Right-of-Way/Easement Utility Permit shall be amended only in writing executed by all parties hereto. <br />10. CHOICE OF LAWS This Right-of-Way/Easement Utility Permit shall be construed in accordance with the laws of the State of Nebraska and <br />the City of Grand Island, Nebraska. The rights and privileges granted herein shall be nonexclusive and shall not be construed to be any <br />broader than those expressly set out in City Code or State Law, regardless of the language used in this permit and that any facilities placed on <br />City right-of-way/easement shall be placed in accordance with existing laws and the standards of the City. <br />