Laserfiche WebLink
VIAERO FIBER NETWORKS, LLC CONSTRUCTION PLANS <br />GRAND ISLAND BISMARK TO GRAND ISLAND EAST TOWER <br />CITY OF GRAND ISLAND, NEBRASKA Exhibit "A" 2024/5/2 <br />CONSTRUCTION NOTES: <br />1. CONTRACTOR MUST HAVE A COPY OF THE APPROVED PERMIT <br />FROM THE APPROPRIATE AGENCIES ON THE JOBSITE AT ALL <br />TIMES. <br />2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL AUTHORITIES <br />HAVING JURISDICTION IN THE WORK ZONE. <br />3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, <br />QUANTITIES, AND EXISTING CONDITIONS PRIOR TO STARTING <br />CONSTRUCTION. <br />4. CONTRACTOR MUST OBTAIN LOCATES AND POTHOLE ALL <br />UTILITIES ALONG THE PLANNED RUNNING LINE PRIOR TO <br />CONSTRUCTION. <br />5. THE UTILITY SIZE AND EXACT LOCATION CROSSING THE <br />PROPOSED RUNNING LINE SHALL BE DETERMINED DURING THE <br />POTHOLE PROCESS AND NOTED ON THE CONSTRUCTION <br />DRAWINGS. <br />6. CONTRACTOR IS RESPONSIBLE FOR DETERMINING LOCATION <br />AND AVOIDING ALL CONFLICTS WITH EXISTING UTILITIES. <br />7. ALL CABLE IS TO BE PLACED AT THE VIAERO STANDARD <br />MINIMUM DEPTH OF 48'. <br />8. ANY DISTURBED LANDSCAPING IS TO BE REPLACED TO EQUAL <br />OR BETTER THAN THAT WHICH EXISTED PRIOR TO WORK. <br />9. ALL WORK IS TO BE PROPERLY BACKFILLED PRIOR TO END OF <br />WORKDAY. NO OPEN TRENCHES ARE ALLOWED OVERNIGHT. <br />10. NO CONSTRUCTION ON PRIVATE PROPERTY IS TO COMMENCE <br />UNTIL EASEMENT IS GRANTED IN WRITING BY VIAERO. <br />11. IN AREAS WHERE PROPOSED WORK IS IN CLOSE PROXIMITY TO <br />EXISTING RIGHTS -OF -WAYS AND/OR PROPERTY LINES, <br />CONTRACTOR IS RESPONSIBLE FOR LOCATING SAID LINES AND <br />AVOIDING ENCROACHMENT ONTO UNAUTHORIZED PROPERTY. <br />12. THESE PLANS ARE PRESENTED IN A PERFORMANCE <br />SPECIFICATION FORMAT. BIDDING CONTRACTORS ARE ADVISED <br />TO CONTACT VIAERO FIBER NETWORKS, LLC FOR ANY <br />ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING <br />SCOPE OF WORK OR THE REQUIREMENTS NECESSARY FOR <br />PROJECT COMPLETION. <br />13. CONTRACTORS ARE ADVISED TO CONTACT VIAERO FIBER <br />NETWORKS, LLC FOR ANY ADDITIONAL INFORMATION OR <br />CLARIFICATION CONCERNING SCOPE OF WORK OR THE <br />REQUIREMENTS NECESSARY FOR PROJECT COMPLETION. <br />CONTACT INFORMATION: <br />VIAERO FIBER NETWORKS LLC <br />RON CHRISTENSEN PH: 970-487-3142 <br />ron.c11rlstemeneN184r0.00r11 <br />FINLEY ENGINEERING COMPANY, INC <br />507-777-2000 <br />GENERAL NOTES: <br />1. RUNNING LINE PLAN COLOR INDICATES: <br />VICINITY MAP: BLACK = FOR ROUTE ONLY <br />PLAN SHEETS: RED = DIRECTIONAL BORE <br />PLAN SHEETS: GREEN = PLOW <br />PLAN SHEETS: TRENCH = ORANGE <br />I Island <br />F <br />05 <br />SEC 15 <br />CRY OF <br />{} <br />GRAND ISLAND C. W.fA1701-k <br />Pow, Plant <br />A <br />Grand Island <br />Church <br />of God <br />E 00000 01 <br />E South St <br />a <br />SEC 22 <br />I <br />_.....,ECT <br />STUHR RD S <br />SeWling E.148 <br />P,r+r,enlar; <br />School <br />MATERIAL LIST <br />UNIT <br />UNIT DESCRIPTION <br />ESTIMATED <br />ACTUAL <br />FT <br />VIAERO 4' SCH 80 HDPE <br />1300 <br />ROER NOTES <br />FT <br />VIAERO (3) MULTICOLORED 1.25' SDR -11 <br />3705' <br />FT <br />VIAERO 144 ARMORED FIBER <br />3945' <br />EA <br />VIAERO 30-X48'X24.20K HX <br />2 <br />EA <br />VIAERO 30'X19'%38',2010 SP HH <br />0 <br />SCOPE OF WORK: <br />THIS PROJECT IS PROPOSED TO CONSTRUCT CONDUITS UNDERGROUND BEGINNING AT INTERSETCTION OF STUHR RD S AND <br />BISMARK RD E GOING EAST TO BNSF RR TRACKS. THIS PROPOSED PROJECT IS APPROXIMATELY 3,705 LONG. <br />PncitctS MT <br />LABOR LIST <br />UNIT <br />UNIT DESCRIPTION <br />ESTIMATED <br />ACTUAL <br />FT <br />DIR BORE 4' SCH 80 HDPE WI(3)125' SDR -11 <br />1300 <br />ROER NOTES <br />FT <br />DIR BORE (3) MULTI -COLORED 125' SDR -11 <br />1300 <br />FT <br />TRENCH (3) MULTI -COLORED 1.25' SDR -11 <br />500 <br />FT <br />PLOW (3) MULTICOLORED 125' SDR -11 <br />3385' <br />FT <br />PLACE VIAERO 144 ARMORED FIBER <br />3945' <br />EA <br />PLACE VIAERO 301(481(24120K HH <br />2 <br />EA <br />PLACE VIAERO 30'X48706'201( SP HH <br />0 <br />PROJECT APPROVAL SIGN -OFFS: <br />WORK PLAN INDEX <br />SHEET <br />DRAWING NAME <br />01 <br />CONK SNIT <br />02-03 <br />ROEO REM <br />04-05 <br />ROER NOTES <br />06-10 <br />HELM NIRS <br />CITY OF GRAND ISLAND: <br />KEITH KURZ PE, PUBLIC <br />WORKS DIRECTOR <br />100 E FIRST ST <br />GRAND ISLAND, NE 68801 <br />PO BOX 1968 <br />GRAND ISLAND, NE 68802-1968 <br />308-385-5455 <br />keltk@grand-island.conl <br />CABLE RTE <br />CITY OF GRAND ISLAND <br />DATE: <br />VIAERO FIBER NETWORKS. LLC <br />DATE: <br />LEGEND <br />SHEET ARI <br />FRE HYDRANT <br />MA1ER W1ER <br />GAS NOIR <br />ELECTRIC IE1ER <br />MST YALE <br />UlU11Y PRE <br />UIEIIY MANHOLE <br />EASING STORM MANHOLE <br />EASING STREET WIT <br />D COSMO 25261 HANDH01E <br />• DECTRCN/URITY CANT <br />171 TELEPHONE PED - CROSS BOM <br />® PROPOSED NANO MANHOLE <br />RtOPOSED \AERO RANKLE <br />IM STORM INET <br />▪ STORM CRATE <br />—� OILNRT <br />{� RINE <br />• BORE RT <br />• DE511NG EDL <br />•.v i. �'` <br />MING L),IIDSUPE AREA <br />USING POE CELL TORR <br />LINETYPES <br />__. LUWHIOIN CRINACI <br />02af5iLOM <br />0001f1-5055 <br />• • — 96U1-DEC'BOPE BOE <br />- - LOP- <br />ROO-a-91r <br />BRAE OF ASMAT <br />Ola a WOO <br />ENE a NEW <br />NR RNa-0351Nc <br />0010KE-015164 <br />WAD OR -DISHING <br />RAILROAD -OWN <br />9NERCRI 90 01CR C-DEMC <br />OEREM 0ECIRC-E8512G <br />N ED 1004590 <br />IRER8E-ENSRIG <br />SPIV A*R-09ING <br />SONNY SERB -0E550 <br />SWAM <br />= 11A1W-CISNIG <br />• <br />V ,AERO <br />Fiber Networks. LLC <br />DATE CREATED: 3/27/2024 <br />DATE REVISED: 4/23/2024 <br />DATE PLOTTED: 4/23/2024 <br />DRAWN BY: FEC <br />CHECKEDBY: FEC <br />APPROVED BY: <br />PANT: <br />VNERO FIBER NETWORKS, ILC <br />SITE ADDRESS: <br />GRANO ISLAND&SMME TO <br />GRAND ISLAND AST <br />HALL COUNTY, NE <br />T11N R9W <br />FILE NA <br />OFF Of GRAND <br />ISIANO.dwg <br />DESCRIPTION: CONSTRUCTION PRAMS <br />COVER SHEET <br />MAP: 01 OF 10 <br />