Laserfiche WebLink
MAINTAIN 3' OF HORIZONTAL SEPARATION <br />IF PARALLELING WATER MAINS & FIRE <br />HYDRANTS. MAINTAIN 1' OF VERTICAL <br />SEPARATOR AT WATER MAIN CROSSINGS. <br />MAINTAIN 3' SEPARATION FROM ELECTRIC <br />UTILITY PRIMARY. <br />10 BE PERAIREO <br />By OTHERS <br />paNE <br />PROPOSED WIERO DIP -GSL HH 302 <br />(TO BE PERMITTED By OTHERS) —04' <br />_—n""�sOwH <br />EDP <br />it <br />0 <br />5 <br />tw uw -wI <br />tl <br />BE <br />PLC HH, END STATE RAS <br />CRY OF GRAND ISLAND NOTES: <br />WHERE CROSSING SIGNAL INFRASTRUCTURE <br />Conduit shall not be placed between the City's traffic signal cabinet and connecting <br />traffic signal condulupolea. Conduit must be offset a minimum of 5' from the base of <br />any traffic signal cabinet, traffic signal pole, or traffic signal pull box. <br />IF SIGNAL CONDUITNYIRE HAS TO BE CROSSED THE NEW LINE SHALL BE A <br />MINIMUM OF 6' DEEP WHERE CROSSING AND THE EXSTING SIGNAL <br />CONDUIT SHALL BE POTHOLED AND VERIFIED ON-SITE PRIOR TO BORING. <br />CITY OF GRAND ISLAND <br />SEE SHEETS 124, 12B 8 13 FOR <br />CITY OF GRAND ISLAND NOTES <br />PROPOSED VIAERO GIP -GSL HR 003 <br />30'1,4I730'1201( POLYMER CONCRETE <br />(TO RE PERMITTED 81 OTHERS) <br />TO PEBEnr <br />SYMMS <br />DIRECTIONAL BORE (0) MULTICOLORED <br />1.23' NAPE SORII - 300' <br />PLACE VIAERO 224 ARMORED RISER <br />PAIBONA LOT <br />RW MW—NR—MAI—NR—RNV—RIR <br />RIR RAY NR - —NW— <br />r, -- w — w <br />st)0( <br />vao <br />S LOCUST ST <br />ILj <br />DD FDP——060 <br />W <br />LCA <br />p <br />S <br />IV) <br />N <br />0--E--EEaP <br />CC <br />4.00 <br />M ; M M <br />�w —w —w w �w —w —w —w w —Ww <br />My RIR <br />4• 0, /-,� <br />1024 <br />i <br />40 <br />ED <br />ED <br />w —6 <br />MATERIAL LIST <br />UNIT <br />UNIT DESCRIPTION <br />ESTIMATED <br />ACTUAL <br />FT <br />VIAERO (6) MULTI -COLORED 1.25 SDR -11 <br />360' <br />FT <br />VIAERO 286 ARMORED FIBER <br />360' <br />EA <br />VIAERO 301X48'X36120K HH <br />0 <br />CAUTION: <br />MULTIPLE BURIED <br />U18JTE8 IN AREA <br />LABOR LIST <br />UNIT <br />UNIT DESCRIPTION <br />ESTIMATED <br />ACTUAL <br />FT <br />DIR BORE (6) MULTI -COLORED 1.25' SDR -11 <br />360' <br />FT <br />PLOW (6) MULTICOLORED 1.25' SDR -11 <br />D <br />FT <br />PLACE VIAERO 268 ARMORED FIBER <br />360' <br />EA <br />PLACE VIAERO 30'X48'%36'20( HH <br />0 <br />NOTE: 0 ion <br />PLACE GIlTION WARNING RIBBON <br />1 FOOT ABOVE THE CABLE. SCALE: I" 50' <br />®O®%0®SID <I <br />IID <br />• <br />LEGEND <br />STREET SDI <br />ERE MAW <br />MER Ii1ER <br />GAS AFTER <br />aEClRC IE150 <br />UMW 108.16 <br />OMIT POE <br />OMIT IIANIOE <br />EISRNG STOW 44401E <br />OWING STREET UGIT <br />DOSING UTIITY HALZOUN/ <br />ELECTRCAL/URLTY CADET <br />TEEEPIONE PED - CROSS BOX <br />PPOP09D WELD IIAMIGE <br />PROPOSED 06000 HNDHGE <br />STOW MET <br />5TG06 GRAZE <br />CUDER1 <br />REE <br />▪ BORE RT <br />® 085TNG WELL <br />W.,`;`,1 ERSING 111D5GPE NEA <br />DEM POLE COL TONER <br />0 <br />LINETYPES <br />TDD61-lNOT R 03116/11 <br />WI(0-ROA <br />CODE -18701 <br />c0DD1-OEODBA mE <br />8011 -G -SLY <br />Eno a ASPRAT <br />EOE a 0LLVI <br />MI5 OF SOW <br />NE RIO-DESRG <br />1000 RIO-Ew51116 <br />GUAR RAAi1S1N6 <br />10210/0-11SSS <br />GAS-DSING <br />LMERGICUO IECMC-D SRX <br />MEAD DLCRCADD111G <br />BAD FED -DESS <br />1EUAOE-D6111G <br />1RMI S7R-LISMG <br />0900(40 9ER- ISN( <br />sm1Ni <br />-.. <br />INITR-ESSIING <br />BIRONO-EI51SDXG <br />VIAERD <br />Fiber N.tworks, LLC <br />DATE CREATED: 3/28/2024 <br />DATE REVISED: 5/7/2024 <br />DATE PLOTTED: 5/7/2024 <br />DRAWN BY: FEC <br />CHECKED BY: FEC <br />APPROVED BY: <br />COMPANY: <br />VIAERO FIBER NETWORKS, LLC <br />SHE ADDRESS: <br />INDUSTRIAL PARK TO SOUTH LOCUST <br />GRAND ISLAND, NE <br />T11N R9W <br />FILE NAME: IND <br />PARK-LOCUST-aTY.dw. <br />OESCRIP110N: CONSTRUCHNI PlAN5 <br />PROJECT SHEET <br />MAP' 02 OF 18 <br />