Laserfiche WebLink
B <br />ACCEPTABLE FILL MATERIALS: STORMTECH SC -740 CHAMBER SYSTEMS <br />MATERIAL LOCATION <br />DESCRIPTION <br />AASHTO MATERIAL <br />CLASSIFICATIONS <br />COMPACTION / DENSITY REQUIREMENT <br />FINAL FILL: FILL MATERIAL FOR LAYER V STARTS FROM THE TOP OF THE <br />LAVER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED <br />GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' <br />LAVER. <br />ANY SOIUROCK MATERIALS, NATIVE SOILS, OR PER ENGINEERS PLANS. <br />CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. <br />INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE <br />EMBEDMENT STONE ('B' LAVER) TO 18' (450 mm) ABOVE THE TOP OF THE <br />CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE <br />LAYER. <br />GRANULAR WELL -GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR <br />PROCESSED AGGREGATE. <br />MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS <br />LAYER. <br />EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE <br />FOUNDATION STONE (A' LAVER) TO THE 'C' LAYER ABOVE. <br />TA FOUNDATION STONE: FLL BELOW CHAMBERS FROM THE SUBGRADE UP TO CLEAN, CRUSHED, ANGULAR STONE <br />THE FOOT (BOTTOM) OF THE CHAMBER. OR RECYCLED CONCRETES <br />PLEASE NOTE: <br />1. THE LISTED MSHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR 64 STONE WOULD STATE: 'CLEAN, CRUSHED, ANGULAR NO.4 (AASHTO M43) STONE'. <br />2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6' (150 mm) (MAX( LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. <br />3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR <br />COMPACTION REQUIREMENTS. <br />4. ONCE LAYER 'C' IS PLACED, ANY SOIUMATERIAL CAN BE PLACED IN LAYER D UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR' D' AT THE SITE DESIGN ENGINEER'S DISCRETION. <br />5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS' A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 620 "RECYCLED CONCRETE STRUCTURAL BACKFILL'. <br />CLEAN, CRUSHED, ANGULAR STONE <br />OR RECYCLED CONCRETE' <br />WA <br />AASHTO M145' <br />A-1, A-2-4, A-3 <br />OR <br />MSHTO M43' <br />3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7. 78, 8, 89, 9, 10 <br />PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED <br />INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND <br />PREPARATION REQUIREMENTS. <br />BEGIN COMPACTIONS AFTER 17 (300 mm) OF MATERIAL OVER <br />THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN <br />6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR <br />WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR <br />PROCESSED AGGREGATE MATERIALS. ROLLER GROSS <br />VEHICLE WEIGHT NOT TO EXCEED 12,000 In (53 kN). DYNAMIC <br />FORCE NOT TO EXCEED 20,000 b (69 kN). <br />AASHTO M43' <br />3, 357, 4, 467, 5, 56, 57 <br />AASHTO 1843' <br />3, 357, 4.467, 5, 58, 57 <br />NO COMPACTION REQUIRED. <br />PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE u <br />PERIMETER STONE <br />(SEE NOTE 4) <br />EXCAVATION WALL (CAN <br />BE SLOPED OR VERTICAL) <br />ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXT1LE ALL <br />AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS <br />12" (300 mm) MIN <br />NOTES: <br />Li, <br />yuuuu u4 a u 514Ey,4u.L.,..... <br />PAVEMENT LAYER (DESIGNED <br />BY SITE DESIGN ENGINEER) <br />D / TO BOTTOM OR RISME WOMEN, TORUwAm <br />NBTAUATTOM MERE RUTTING FROM VENGEa MAI OLQIK <br />C NCREASE COVER TO 2, (l.O mm). <br />SC -740 <br />END CAP <br />SUBGRADE SOILS <br />(SEE NOTE 3) <br />(150 mm) MIN <br />6' (150 mm) MIN <br />30' <br />(760 mm) <br />18' <br />(450 mm) MIN' <br />(2.4 m) <br />MAX <br />"THIS CROSS SECTION DETAIL REPRESENTS <br />MINIMUM REQUIREMENTS FOR INSTALLATION. <br />PLEASE SEE THE LAYOUT SHEET(S) FOR <br />PROJECT SPECIFIC REQUIREMENTS. <br />DEPTH OF STONE TO BE DETERMINED <br />BY SITE DESIGN ENGINEER 6' (150 mm) MIN <br />51'(1295 mm) — — 12'(300 mm)TYP <br />1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, 'STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS'. <br />2. SC -740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS'. <br />3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH <br />CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. <br />4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. <br />5. REQUIREMENTS FOR HANDLING AND INSTALLATION: <br />• TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. <br />• TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2'. <br />• TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION. a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 550 LBS/FT/%. THE ASC IS DEFINED IN SECTION 62.8 <br />OF ASTM F2416. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73' F / 23' C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR <br />YELLOW COLORS. <br />W <br />H0 <br />Oce � <br />O <br />0 <br />Z <br />7 <br />E <br />WU <br />1 <br />1 <br />