Laserfiche WebLink
RWEI.24.27 716 LAMBERT ST <br />CASH <br />CHECK <br />REFUNDS: <br />CASH <br />CHECK <br />- - . RF :w ' <br />0- HILL r' . �T Y NE <br />a= 6�S 7:1710 0 2 0 202 49 <br />Please returito. <br />Catrina DeLosll <br />Public Works Department <br />PO Box 1968 <br />Grand Island, NE 68802 <br />This Space Reserved for Rooster of Dead <br />Right-of-Way/Easement Utility Permit <br />[t '.1.511 YakVLt/ <br />R GlSTERR OF DEEDS <br />This Right-of-Way/Easement Utility Permit is granted by the CITY OF GRAND ISLAND, NEBRASKA, a municipal Corporation, herein referred <br />to as the "Permitor" and Unite Private Networks, hereinafter referred to as the "Permittee'. <br />1. STATEMENT OF PURPOSE. The purpose of this Permit is to set forth the terms and conditions, under which the Permittee may construct, <br />maintain, repair, and utilize the following described installation/improvement which will infringe upon a public easement: <br />To access the City's public right-of-way area for installation of fiber optic cable to serve the property addressed as 716 Lambert Street, per the <br />attached Exhibit "A", dated 2024/5/1 and consisting of five (5) pages. <br />2. DESCRIPTION OF PERMITEE'S UTILITY LOCATION. The Permittee owns the infrastructure within the Permitor's public easement to which this <br />Right-of-Way/Easement Utility Permit shall apply: <br />ALL OF BLOCK 5, LAMBERTS ADDITION TO THE CITY OF GRAND ISLAND, HALL COUNTY. NEBRSAKA. <br />3. PERMITEE'S DUTIES AND RISKS. It is understood and agreed that the Permittee may construct, maintain, repair and utilize the above described <br />installation/improvement at the Permittee's sole risk. The ?ermittee hereby waives any claim for damages against the Permitor, its officers, <br />employee, agents and independent contractors for any damage or injury that may result to said installation/improvement. If the Permitor, in its sole <br />discretion, determines that any part or all of the installation/improvement must be removed or is damaged by the Permitor, its employees, agents or <br />independent contractors working for the Permitor during the course of their employment or duties with the Permitor, the Permittee agrees to assume <br />and pay all costs relating to the replacement or repair of the installation/improvement. Permittee indemnifies and holds the City harmless from and <br />against all claims arising out of the use or occupancy allowed under this permit. <br />All facilities thereto, after having been erected, shall at all times be subject to inspection and the right is reserved to require such changes. additions, <br />repairs, relocations and removal as may at any time be considered necessary to permit the relocation, reconstruction, widening and maintaining of a <br />City facility and to provide proper and safe protection to life and property on or adjacent to City facilities, or in the interest of safety to traffic on the <br />roadways and that the cost of making such changes, additions, repairs and relocations shall be borne by the applicant, and that all of the cost of the <br />work to be accomplished under this permit shall be bome by the permittee who agrees to hold the City harmless therefore. <br />Permittee is responsible for submitting an approved traffic control plan prior to commencement of any work. Locate flags shall be removed <br />after the "excavator" has determined the work is complete. <br />Permittee shall coordinate any and all work with the City of Grand Island, their consultant, and contractor eliminate any interference with <br />known/marked City utilities. Any interference with City utilities shall be addressed immediately and at the expense of the Permittee. <br />4. PROTECTION OF EXISTING UTILITIES. The Permittee is responsible for locating and coordinating original construction and future maintenance <br />work on the described installation/improvement. No excavation work will be permitted in the area of underground utility facilities until all such facilities <br />have been located and identified to the satisfaction of all parties. The excavation must be done with care in order to avoid any possibility of damage <br />to the utility facility. The Permittee shall be responsible for any and all damages, except to the extent that such damaged facility failed to comply with <br />the requirement of Neb. Rev. Stat. 76-2301 et seq. <br />