My WebLink
|
Help
|
About
|
Sign Out
Browse
202401213
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202401213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 10:19:51 AM
Creation date
3/25/2024 10:18:04 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202401213
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NOTES <br />1. THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY FACILITIES <br />MAY NOT BE INDICATED ON THESE PLANS. UNDERGROUND UTILITIES, <br />WHETHER SHOWN OR NOT, WILL BE LOCATED AND FLAGGED BY THE <br />UTILITIES UPON THE REQUEST OF THE CONTRACTOR. NO EXCAVATION <br />WILL BE PERMITTED IN THE AREA OF THE UNDERGROUND UTILITIES <br />UNTIL ALL SUCH FACILITIES HAVE BEEN LOCATED AND IDENTIFIED TO <br />THE SATISFACTION OF ALL PARTIES. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND AND AERIAL <br />UTIUTIES AND CONSTRUCTIMS. <br />2. UNLESS OTHERWISE AGREED TO IN WRITING IN ADVANCE OF THE <br />PROJECT CONSTRUCTION, THE DEPTH OF INSTALLED FACILITIES <br />SHALL BE, ATA MINIMUM, AS FOLLOWS: <br />A. FORTY-TWO (42) INCHES IN SOIL. <br />B. FORTY-TWO (42) INCHES BELOW A PROJECTED SLOPE FROM THE <br />FLOW UNE OF A DITCH AT A THREE (3) HORIZONTAL AND ONE (1) <br />VERTICAL SLOPE. <br />C. FORTY-EIGHT (48) INCHES UNDER A ROADWAY MEASURED FROM <br />THE SURFACE OF SAID ROADWAY TO THE TOP OF THE <br />INSTALLATION. <br />D. FORTY-EIGHT (48) INCHES UNDER A STORM WATER OR CREEK <br />CHANNEL DESIGN FLOW LINE, AND <br />E. MAINTAIN A MINIMUM OF 24' OF VERTICAL & HORIZONTAL <br />SPACING FROM EXISTING UTILITIES. <br />3. ALL POTHOLES IN SIDEWALK PANELS WILL REQUIRE FULL PANEL <br />REPLACEMENT. <br />4. ANY CUT OR POTHOLE IN A CONCRETE STREET PANEL WILL REQUIRE <br />FULL PANEL REPLACEMENT OR CORE REPLACEMENT WITH AN <br />APPROVED EPDXY. <br />5. ANY CUT OR POTHOLE IN AN ASPHALT STREET LANE WILL REQUIRE SEAM <br />TO SEAM ASPHALT MILLING AND REPLACEMENT. <br />8. ALL WORK ZONE TRAFFIC CONTROL, INCLUDING PEDESTRIAN CONTROL <br />MEASURES. SHALL BE IN COMPLIANCE WITH THE MUTCD, LATEST EDITION. <br />AND ADA. <br />7 PULL STRING SHALL BE INSTALLED IN EACH AND EVERY NEW CONDUIT. <br />AERIAL FIBER INSTALLATION CITY OF GRAND ISLAND NOTES <br />1. INSTALUADJUST MESSENGER GABLE AND FIBER PER NESC AND UTILITY <br />POLE OWNER REQUIREMENTS. <br />2. FIELD VERIFY ALL NEWLY INSTALLED MESSENGER CABLE AND FIBER <br />CLEARANCES ARE CONSTRUCTED IN ACCORDANCE WITH NESC AND UTILITY <br />POLE OWNER REQUIREMENTS. <br />3. ALL ABANDONED BOLT HOLES ARE TO BE TREATED WITH WOOD PRESERVER <br />AND PLUGGED WITH SIMILAR MATERIALS PER OWNER REQUIREMENTS. <br />4. GROUNDING TO BE INSTALLED PER NESC REQUIREMENTS. <br />1. CONDUIT SHALL NOT BE PLACED BETWEEN THE CITY'S TRAFFIC SIGNAL <br />CABINET AND CONNECTING TRAFFIC SIGNAL CONDUIT/POLES. CONDUIT <br />MUST BE OFFSET A MINIMUM OF 5' FROM THE BASE OF ANY TRAFFIC SIGNAL <br />CABINET, TRAFFIC SIGNAL POLE, OR TRAFFIC SIGNAL PULL BOX. <br />2 CONTRACTOR WILL BE REQUIRED TO OBTAIN A PERMIT TO WORK IN THE <br />ROW (INCLUDING A TRAFFIC CONTROL PLAN) BEFORE ANY PHYSICAL WORK <br />IS TO TAKE PLACE. <br />3. LOCATE FLAGS SHALL BE REMOVED AFTER THE 'EXCAVATOR' HAS <br />DETERMINED THE WORK 15 COMPLETE. <br />4. IF SIGNAL CONDUIT/WIRE WAS TO BE CROSSED THE NEW LINE SHALL BE A <br />MINIMUM OF 8' DEEP WHERE CROSSING AND THE EXISTING SIGNAL CONDUIT <br />SHALL BE POTHOLED AND VERIFIED ONSITE PRIOR TO BORING. <br />5. STREETS DIVISION SHALL BE CONTACTED PRIOR TO WORK BEGINNING AT <br />308-385-5322 ANY KEYHOLE POTHOLING LOCATIONS IN THE ROADWAY <br />SHALL BE APPROVED BY THE STREETS DIVISION AND SHALL BE FILLED <br />WITHIN FIVE DAYS OF POTHOLING. <br />8. NO HANDHOLDS OR VAULTS SHALL BE PLACED N THE FLOWLINE OR <br />SLOPED BANK OF DRAINAGE DITCHES. IF IT HAS TO BE PLACED ON SLOPED <br />BANK THE FINAL GRADE OF HANDHOLD OR VAULT LID SHALL MATCH THAT <br />OF THE SLOPED BANK. EROSION CONROL SHALL BEN PLACE FOR ALL <br />OPEN EXCAVATIONS ADJACENT TO DRAINAGE DITCHES. ALL DRAINAGE <br />DITCH FLOWLINES MUST BE RESTORED BEFORE JOB IS DONE. <br />PROJECT N0. <br />PO -97109 <br />SHEET NO. <br />UPN: <br />2 <br />JEO: 23029838 <br />Dete f8#44R-2014 <br />New: BRE <br />CM4u0. .1011 <br />A oro e0: MAF <br />Unite <br />CENTURYLINK LUMEN <br />703 S WEBB RD <br />GRAND ISLAND, NE <br />Know what's below. <br />Call before you dig. <br />PRIOR ro CONSTRUCTION <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC, GAS MANS, CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EJOSTNG UNDERGROUND AND <br />OVERHEAD UTLRES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />IT IS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />JEO CONSULTING GROUP INC <br />1937 N. CMehvl St* <br />Walm, NE 89988 <br />1 !89.723.8587 <br />JEO ConMBp 0,0*, M <br />Orgenesem Ceterale al Aulled lba <br />Number: CAL009 <br />GENERAL NOTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.