My WebLink
|
Help
|
About
|
Sign Out
Browse
202400793
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202400793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:59:43 PM
Creation date
2/26/2024 3:07:30 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202400793
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
202400793 <br />use and occupancy, and the proposed facilities shall not be dangerous to persons or property using or occupying <br />the roadway or using facilities constructed under previously granted permits of use and occupancy; and that the <br />City's records of prior permits are available, it being the duty of the applicant to determine the existence and <br />location of all facilities within the City right-of-way/easement. <br />5. RESTORATION OF PROPERTY. If the construction or maintenance of the installation/improvement identified in <br />Paragraph 1 above requires the excavation of earth, removal of hard surfacing, grass, vegetation, landscaping, or <br />any other disruption of the surface of the public right-of-way/easement or neighboring property, the Permittee shall <br />restore the surface of the area to the same condition as it existed immediately prior to the Permittee's work in the <br />area. <br />Drainage in roadway side and cross ditches must be maintained at all times. The entire right-of-way/easement <br />affected by work under a permit must be restored to as good a condition as existed prior to beginning work to the <br />complete satisfaction of the City Engineer. <br />6. EFFECTIVE DATE. This Right-of-Way/Easement Utility Permit shall take effect on the date it is executed by the <br />Public Works Director/City Engineer of the City of Grand Island as dated below. It shall continue for an indefinite <br />term or until such time as it is terminated as provided hereafter. <br />7. TERMINATION. This Right-of-Way/Easement Utility Permit shall terminate upon one or more of the <br />following occurrences: <br />(a) The service of sixty (60) days written notice of intention to terminate by any party upon the other party. If <br />there is a valid Franchise Agreement between the Permitor and Permitee, the termination provisions in that <br />agreement shall supercede. <br />(b) The Permittee's application for a permit to alter said improvement or any part thereof, unless said permit is <br />for work due to an occurrence as described in Paragraph 3 above and said work has the prior written approval <br />of the Permitor. <br />(c) The Permittee's construction or installation of any structure or improvement of any nature upon the City's <br />property, public right-of-way, or easement owned by the Permitor except that described in Paragraph 1 above. <br />Upon the termination of this Right-of-Way/Easement Utility Permit, the Permittee shall be required, and hereby <br />agrees, to remove said improvement from the Permitor's property at its own expense and without cost to the <br />Permitor. Said removal to occur no later than sixty (60) days after receipt of the notice of intention to terminate or <br />any of the occurrences set forth in Paragraph 7 above. Should the Permitee fail to do so, the Permitor may remove <br />or cause the removal of said improvement from the Permitor's property and the Permittee agrees to reimburse the <br />Permitor for all its costs. <br />8. SUCCESSORS AND ASSIGNS. This permit shall be binding upon the parties hereto, their successors and <br />assigns. <br />9. ENTIRE PERMIT. This Right-of-Way/Easement Utility Permit constitutes the entire permit between the parties <br />notwithstanding any other oral or written permits to the contrary. This Right-of-Way/Easement Utility Permit shall be <br />amended only in writing executed by all parties hereto. <br />10. CHOICE OF LAWS. This Right-of-Way/Easement Utility Permit shall be construed in accordance with the laws <br />of the State of Nebraska and the City of Grand Island, Nebraska. The rights and privileges granted herein shall be <br />nonexclusive and shall not be construed to be any broader than those expressly set out in City Code or State Law, <br />regardless of the language used in this permit and that any facilities placed on City right-of-way/easement shail be <br />placed in accordance with existing laws and the standards of the City. <br />11. CONTENT OF LANGUAGE. Wherever the context of the language in this Right-of-Way/Easement Utility <br />Permit is appropriate, the singular shall apply to the plural and the plural shall apply to the singular. <br />
The URL can be used to link to this page
Your browser does not support the video tag.