Laserfiche WebLink
EXHIBIT "A"- 2024/1/29 <br />STAKING SHEET - UNDERGROUND Company: OPTK Networks <br />Exchange: Grand Island <br />Legacy 34 2nd Phase <br />The Grand Island Streets Division shall be contacted prior to work beginning at 308-385-5322. <br />A notice to proceed with work in the ROW will not be given until a pre -construction notice has been given. <br />Any keyhole potholing locations in the roadway shall be approved by the Streets Division and shall be filled within five days of potholing. <br />No handholds or vaults shall be placed in the flowline or sloped bank of drainage ditches. If it has to be placed on sloped bank the final grade <br />of hand hold or vault lid shall match that of the sloped bank. <br />Erosion control shall be in place for all open excavations adjacent to drainage ditches. All drainage ditch flowlines must be restored before <br />job is done. <br />No handholds, vaults, or manholes shall be placed in the ADA accessible area of the sidewalk. <br />Any handholds, vaults or manholes placed in the sidewalk shall match the existing slopes of the sidewalk and shall not be or creating tripping <br />hazard for pedestrians. <br />Any sidewalk removals & replacements shall be approved by the Grand Island Streets Division prior to removal. Restoration of sidewalk shall <br />be done within 5 days of removal. <br />Any street or sidewalk closures require a 72 -hour notice to the City of Grand Island Public Works Department at 308-385-5444. <br />Proposed footages <br />and materials <br />Unit <br />Description <br />1,020 <br />Bore or plow w/1.25" HOPE <br />1,800 <br />Pull 48F S/S <br />3 <br />24x36x24 Vaults <br />1 <br />Enter exisiting HH <br />2 <br />Ground rods <br />• _a <br />OPTErl <br />Networks <br />Notes/Special Instructions <br />Maintain 3' of horizontal separation if paralleling water <br />mains, fire hydrants, etc. Maintain 1' of vertical separation atj <br />water main crossings. This does appear to follow the water <br />main alignment in some locations - Utilities Engineering <br />would like to be contacted 24 hrs prior to work being done <br />to ensure clearances will be met, 308-385-5463. <br />St71700t-60 <br />