My WebLink
|
Help
|
About
|
Sign Out
Browse
202400444
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202400444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 2:10:57 PM
Creation date
1/30/2024 2:09:27 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202400444
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A"- 2024/1/29 <br />STAKING SHEET - UNDERGROUND <br />Company: OPTK Networks Exchange: Grand Island <br />EDWARD JOHNS -307 N LOCUST.GRAND ISLAND.NE <br />Conduit shall not be placed between the City s traffic signal cabinet and connecting traffic signal conduit/poles. Conduit must be offset a <br />minimum of 5' from the base of any traffic signal cabinet traffic signal pole. or traffic signal pull box. <br />If Signal ConduiWyire has to be crossed the new line shall be a minimum of 6' deep where crossing and the existing signal conduit shall <br />be potholed and venfled on-site by the City of Grand Island Streets Division prior to boring. <br />The Grand Island Streets Division shall he contacted prior to work beginning at 308-385-5322. <br />A notice to proceed with work in the ROW will not be given until a pre -construction notice has been given. <br />Any keyhole potholing locations in the roadway shall be approved by the Streets Division and shall be filled within five days of potholing_ <br />Nohandholds, vaults. or manholes shall be placed in the ADA accessible area of the sidewalk. <br />Any handholds. vaults or manholes placed in the sidewalk shall match the existing slopes of the sidewalk and shall rot be or creating <br />tripping hazard for pedestrians. <br />Any sidewalk removals 8 replacements shall be approved by the Grand Island Streets Division prior to removal. Restoration of sidewalk <br />shall be done within 5 days of removal. <br />Proposed footages <br />and materials <br />Unit <br />Description <br />1 <br />24x36x24 <br />75' <br />HDPE 1.25" <br />400' <br />12f <br />1 <br />Junction Box <br />1 <br />Riser Gaurd <br />60' <br />1/2" Guard <br />tiPTK <br />Networks <br />Notes/Special Instructions <br />Maintain 3' of horizontal <br />separation if paralleling <br />water mains. Maintain 1' of <br />vertical separation at water <br />main crossings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.