My WebLink
|
Help
|
About
|
Sign Out
Browse
202400132
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202400132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:55:30 PM
Creation date
1/10/2024 1:54:07 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202400132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAKING SHEET - UNDERGROUND <br />Company: OPTK Networks <br />Exchange: <br />p4 •Setc t.4SL1x,. T <br />Enter building here w. <br />electrical Cut restore <br />concrete. Leave 76' 12F <br />tail Inside for OPTK to <br />...:*` pull <br />Srard <br />1204 Allen Dr <br />Bore 106'+i - <br />Cu <br />r <br />Enter existing vault. <br />Leave 60' tail. <br />Bore 370'(+/-) 48F and <br />HDPE 1-26" <br />Set T -4S vault Splice <br />case here Alto will <br />enter this vault and <br />ride conduit to <br />building. SPLIT COST <br />starting here. 60' Tad <br />48F and 12F. <br />Set new 24x36x24 <br />vault 120' loop. <br />(Maintain 3' of <br />horizontal separation if <br />paralleling water <br />mains Maintain 1' of <br />vertical separation at <br />water main crossings <br />1.111111111111 <br />111011111111111 <br />11111111111111111111 <br />Inn I <br />sailsIla <br />tam <br />Ina <br />MOM <br />MOT <br />1111naa11.1111 <br />111111111111111110 <br />111111.11111111 <br />awn <br />=�erThe Grand Island Streets Division shall be contacted prior to work beginning at <br />aim /111111/111111/0 308-385-5322. <br />= " m Any keyhole potholing locations In the roadway shall be approved by the Streets Division <br />II1NMEINIMININi>i and shall be filled within five days of potholing <br />1111.11.1.1.11.1."111111.1+ No handholds or vaults shall be placed in the flowline or sloped bank of drainage ditches. If <br />U ---ate <br />Isimi111111111lSIIIII it has to be placed on sloped bank the final grade of hand hold or vault lid shall match that <br />� - of the sloped bank <br />��--� Erosion control shall be in place for all open excavations adjacent to drainage ditches All <br />wImmilusilimillnololtttmigi drainage ditch flowlines must be restored before job is done. <br />+•xmmaiiimmommirtmiwm No handholds, vaults. or manholes shall be placed in the ADA accessible area of the <br />aaaommen miamminovison <br />martmum aimrammixima sidewalk. <br />�a aal� i� tla� ata�n attl����a <br />s��=�=ig Any handholds, vaults or manholes placed in the sidewalk shall match the existing slopes <br />�.,x.,. ��� aaaa�ain of the sidewalk and shall not be or creating tripping hazard for pedestrians. <br />"ae' " ""e*+.MI.ra._ . ftma m* Any sidewalk removals & replacements shall be approved by the Grand Island Streets <br />Division peer to removal Restoration of sidewalk shall be done within 5 days of removal <br />Any street or sidewalk closures require a 72 -hour notice to the City of Grand Island Public <br />Works Department at 308-385-5444 <br />Conduit shall not be placed between the City's traffic signal cabinet and connecting traffic <br />signal conduitipoles. Conduit must be offset a minimum of 5' from the base of any traffic <br />signal cabinet, traffic signal pole. or traffic signal pull box. <br />Contractor will be required to a locate before any physical work is to take place Locate <br />flags shall be removed after the 'excavator` has determined the work is complete <br />
The URL can be used to link to this page
Your browser does not support the video tag.