Laserfiche WebLink
11/20/3, 9:15 AM <br />HALL COUNTY, NEBRASKA. <br />3. PE <br />repair and <br />he eby wai '-s any clai <br />c•ntractors `•r any da <br />s ft le discreti• n, deter <br />d: maged by t, e Permi <br />t , e course oft eir em <br />r:lating to the -plac <br />CI harmless fro <br />E'S DUTIES AND i -S-1 is understood <br />utilize the ab • „e described installatio <br />for damages against th <br />age or injury'\that may r <br />Ines that any part or a <br />or, its employ s, agents <br />loyment or dut es with th <br />ment or repair dff the in <br />about:blank <br />nd agreethat the Perm <br />�/improvement at the Per <br />Permitor, its officers, em <br />suit to said installation/im <br />of the installation/impro <br />r independent'�contractor <br />Permitor, the Permittee <br />'tallation/improve ent. P <br />d against all claims\arjsk g out of the use or <br />20230631 3 <br />tee maconstruct, maint <br />ittee's sole \ risk. The Perm <br />loyee, agents and indepe <br />rovement. If the Permitor <br />ement must be remove <br />working for the Permitor <br />rees to assu e and pay <br />mittee indemni es and <br />oc _ - . ncy allowed under <br />in, <br />tee <br />dent <br />in its <br />or is <br />during <br />II costs <br />olds the <br />th •ermit. <br />All facilities thereto, after having been erected, shall at all times be subject to inspection and the right is <br />reserved to require such changes, additions, repairs, relocations and removal as may at any time be <br />considered necessary to permit the relocation, reconstruction, widening and maintaining of a City facility and <br />to provide proper and safe protection to life and property on or adjacent to City facilities, or in the interest of <br />safety to traffic on the roadways and that the cost of making such changes, additions, repairs and relocations <br />shall be borne by the applicant, and that all of the cost of the work to be accomplished under this permit <br />shall be borne by the permittee who agrees to hold the City harmless therefore. <br />Permittee is responsible for submitting an approved traffic control plan prior to commencement of any <br />work. Locate flags shall be removed after the "excavator" has determined the work is complete. <br />Permittee shall coordinate any and all work with the City of Grand Island, their consultant, and <br />contractor eliminate any interference with know/marked City utilities. Any interference with City <br />utilities shall be addressed immediately and at the expense of the Permittee. <br />4. PROTECTION OF EXISTING UTILITIES. The Permittee is responsible for locating and coordinating original <br />construction and future maintenance work on the described installation/improvement. No excavation work <br />will be permitted in the area of underground utility facilities until all such facilities have been located and <br />identified to the satisfaction of all parties. The excavation must be done with care in order to avoid any <br />possibility of damage to the utility facility. The Permittee shall be responsible for any and all damages, except <br />to the extent that such damaged facility failed to comply with the requirement of Neb. Rev. Stat. 76-2301 et <br />seq. Must maintain a minimum three (3) foot horizontal separation if paralleling water mains, as well as a <br />minimum one (1) foot vertical separation at water main crossings. Also, must maintain a minimum three (3) <br />foot separation from electric utility primary. <br />Coordination needs to occur with Olsson, Inc. (Brian Friedrichsen @ 308-384-8750) as they are rebuilding <br />storm sewer at Fonner Park Road and Pleasantview Drive. <br />The Grand Island Streets Division shall be contacted prior to work beginning at 308-385-5322. <br />Any keyhole potholing locations in the roadway shall be approved by the Streets Division and shall be filled <br />within five (5) days of potholing. <br />No handholds or vaults shall be placed in the flowline or sloped bank of drainage ditches. If it has to be <br />placed on sloped bank the final grade of hand hold or vault lid shall match that of the sloped bank. <br />about:blank 2/5 <br />