Laserfiche WebLink
MATCH LINE SHEET F.2 <br />Flower Pot 3-1 - 5' East of PW Box 3-1 <br />Avoid ADA Ramps <br />1 Ea. UPN Flower Pot <br />10'0196 SM (Coil) <br />Pull Box 3-1 - Approx. 6' South & 22' West of BOC <br />Place S' of 1.25' Conduit with 96 SM. 1W to Flower Pot 3-1 <br />Avoid ADA Ramps <br />1 Ea. UPN Pull Box <br />80' 0196 SM (Call) <br />PROJECT NO. SHEET NO <br />011-0018 F3 <br />onn. 10,2SP23 <br />Hors. Sub t 50 <br />DOM' IRA <br />Checked 515 <br />Approved . 515 <br />PROJECT. 41306-02W SCR <br />olsson <br />FIEOPASICA CERT IF GTE OF IFIFFICOOY ICA OlOt <br />Unite <br />0 25 50 <br />=arum MINIM <br />Nwrourslibia <br />CIllideorpmig <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDEROROIJA) TELEPHONE, <br />ELECTRIC, GAS MAINS, CABLE <br />TELEVISION AND OTHER UTIl1TES. <br />FASTING UNDERGROUND AND <br />OVERHEAD UTILITES AND <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTTED FROM <br />AVALABLE INFORMATION AND <br />THEREFORE, THEP LOCATIONS <br />MUST BE CONSIDERED <br />APPRO%MATE ONLY. R IS THE <br />RESPONSIBLITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH DUSTING UTILITY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CRY <br />OF GRAND ISLAND STANDARD <br />CONSTRUCTION SPECFICATIONS <br />AND STANDARD PIANS. <br />FIBER DESIGN <br />