Laserfiche WebLink
O'‘ <br />Ln <br />O <br />it <br />ci <br />cs <br />PROJECT NOTES <br />1. THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY FACILITIES <br />MAY NOT BE INDICATED ON THESE PLANS. UNDERGROUND UTILITIES, <br />WHETHER SHOWN OR NOT, WILL BE LOCATED AND FLAGGED BY THE <br />UTILITIES UPON THE REQUEST OF THE CONTRACTOR. NO EXCAVATION <br />WILL BE PERMITTED IN THE AREA OF THE UNDERGROUND UTILITIES <br />UNTIL ALL SUCH FACILITIES HAVE BEEN LOCATED AND IDENTIFIED TO <br />THE SATISFACTION OF ALL PARTIES. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND AND AERIAL <br />UTILITIES AND CONSTRUCTIONS. <br />2 UNLESS OTHERWISE AGREED TO IN WRITING IN ADVANCE OF THE <br />PROJECT CONSTRUCTION, THE DEPTH OF INSTALLED FACILITIES <br />SHALL BE, AT A MINIMUM, AS FOLLOWS: <br />A. FORTY-TWO (42) INCHES IN SOIL. <br />B. FORTY-TWO (42) INCHES BELOW A PROJECTED SLOPE FROM THE <br />FLOW LINE OF A DITCH ATA THREE (3) HORIZONTAL AND ONE (1) <br />VERTICAL SLOPE. <br />C. FORTY-EIGHT (48) INCHES UNDER A ROADWAY MEASURED FROM <br />THE SURFACE OF SAID ROADWAY TO THE TOP OF THE <br />INSTALLATION. <br />D. FORTY-EIGHT (48) INCHES UNDER A STORM WATER OR CREEK <br />CHANNEL DESIGN FLOW UNE. AND <br />E. MAINTAIN A MINIMUM OF 24' OF VERTICAL & HORIZONTAL <br />SPACING FROM EXISTING UTILITIES. <br />3. ALL POTHOLES IN SIDEWALK PANELS WILL REQUIRE FULL PANEL <br />REPLACEMENT. <br />4 ANY CUT OR POTHOLE IN A CONCRETE STREET PANEL WILL REQUIRE <br />FULL PANEL REPLACEMENT OR CORE REPLACEMENT WITH AN <br />APPROVED EPDXY. <br />5. ANY CUT OR POTHOLE IN AN ASPHALT STREET LANE WILL REQUIRE SEAM <br />TO SEAM ASPHALT MILLING AND REPLACEMENT. <br />6 ALL WORK ZONE TRAFFIC CONTROL, INCLUDING PEDESTRIAN CONTROL <br />MEASURES, SHALL BE IN COMPLIANCE WITH THE MUTCD, LATEST EDITION, <br />AND ADA. <br />7 PULL STRING SHALL BE INSTALLED IN EACH AND EVERY NEW CONDUIT. <br />CITY OF GRAND ISLAND NOTES <br />1 CONDUIT SHALL NOT BE PLACED BETWEEN THE CITY'S TRAFFIC SIGNAL <br />CABINET AND CONNECTING TRAFFIC SIGNAL CONDUIT/POLES. CONDUIT <br />MUST BE OFFSET A MINIMUM OF 5' FROM THE BASE OF ANY TRAFFIC SIGNAL <br />CABINET, TRAFFIC SIGNAL POLE, OR TRAFFIC SIGNAL PULL BOX. <br />2 CONTRACTOR WILL BE REQUIRED TO OBTAIN A PERMIT TO WORK IN THE ROW <br />(INCLUDING A TRAFFIC CONTROL PLAN) BEFORE ANY PHYSICAL WORK IS TO <br />TAKE PLACE. <br />3 LOCATE FLAGS SHALL BE REMOVED AFTER THE 'EXCAVATOR" HAS <br />DETERMINED THE WORK IS COMPLETE. <br />4 IF SIGNAL CONDUITM/IRE HAS TO BE CROSSED THE NEW LINE SHALL BE A <br />MINIMUM OF 6' DEEP WHERE CROSSING AND THE EXISTING SIGNAL CONDUIT <br />SHALL BE POTHOLED AND VERIFIED ON-SITE PRIOR TO BORING. <br />5 STREETS DIVISION SHALL BE CONTACTED PRIOR TO WORK BEGINNING AT <br />308-385-5322. ANY KEYHOLE POTHOLING LOCATIONS IN THE ROADWAY <br />SHALL BE APPROVED BY THE STREETS DIVISION AND SHALL BE FILLED <br />WITHIN FIVE DAYS OF POTHOLING. <br />6. NO HANDHOLDS OR VAULTS SHALL BE PLACED IN THE FLOWLINE OR <br />SLOPED BANK OF DRAINAGE DITCHES. IF IT HAS TO BE PLACED ON SLOPED <br />BANK, THE FINAL GRADE OF HANDHOLD OR VAULT LID SHALL MATCH THAT <br />OF THE SLOPED BANK. EROSION CONROL SHALL BE IN PLACE FOR ALL <br />OPEN EXCAVATIONS ADJACENT TO DRAINAGE DITCHES. ALL DRAINAGE <br />DITCH FLOWUNES MUST BE RESTORED BEFORE JOB IS DONE. <br />PROJECT NO. <br />UPN: P0.44005 <br />SHEET NO <br />2 <br />JEO 23029621 <br />Deb: 130CT-2023 <br />D 00: ORB <br />Chocked. JOH <br />Atop rW: NAT <br />Unite <br />COX COMMUNICATIONS <br />1719 ASPEN CIR <br />GRAND ISLAND, NE <br />KI1Dw what s below. <br />Call bet ort: you dig. <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUNDZONE. <br />ELECTRIC GAS MARS, <br />CABLE <br />TELEVISION MID OT/ER UTILITIES. <br />OUSTING UNDERGROUND MID <br />OVERHEAD UTLITES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION MO <br />THEREFORE. TIER LOCATIONS MUST <br />BE CONSIDERED APPROXI&ATE ONLY. <br />IT IS THE RESPONSIBILITY OF TIE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />JEO CONSULTING GROUP INC <br />1937 N. Ch.M. Street <br />Rehm. NE 68060 <br />1 880 123 8887 <br />JEO Consoling Group, Inc. <br />Orgsn5etbn 0010001. W AUM0YAtbn <br />NumMr: CA -0369 <br />GENERAL NOTES <br />