STAKING SHEET - UNDERGROUND Company: OPTK Networks <br />Exchange: GRAND ISLAND <br />CONSTRUCTION PROJECT NOTES <br />h The State. County. City personnel shall be notified a minimum of forty eight (481 hours in advance of initial project <br />construction. <br />2 The utility company and the co action, sl are responsible to have at least one person on the lob at all times. that is <br />'site supervisor certified <br />3 The contractor shall adhere to the current permit and contract specifications <br />4 The locations of all aerial and underground utility facilities may not be indicated on the protect plans The contractor <br />is required to contact the Nebraska and Colorado 811 one call notification center (dial 8111 forty-eight (481 hours <br />prior to working in the oty right of way. No excavation will be permitted in the area of the underground utilities until <br />all facilities have been located and identified to the satisfaction of aII partes. The contractor shall be responsible for <br />protection of all underground and aerial utilities and infrastructure. <br />Whenever underground facilites are in close proximity to the proposed pathway location or whenever the vertical <br />location Of the underground facility rs unknown. the contractor 5h311 use special measures to determine to locations <br />of such underground fackities. <br />a. If the contractor is conducting the excavation by digging from the surface. when in a close proximity to the <br />underground facilities. the contractor shall use hand dg8rg. hydro excavating. or air excava5ng to locate such <br />facility <br />b M the contractor is conducting the excavation by tunneling or boring. the contractor shall deter -rime the vertical <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />util rtes <br />8 Project plans shah dimension new facilities being installed <br />7 Unless agreed to in wring in advance the depth of installed facilities in city and county row shall be at a minimum <br />as follows'. <br />a Forty-eight (48I inches in soil <br />b. Forty-eight (481 inches below a projected slope from the flow line of a ditch at a three (31 honzont31 and one 111 <br />vertical slope. <br />r_. Forty-eight 148) inches under a roadway measured from the surface of said roadway to the top of the installation. <br />d Sixty (CO{ inches under a storm water or creek channel design bottom or pipe. and <br />e. Maintain a minimum of Nrenty-four (241 inches of vertical and horizontal spacing from existing u0lmes <br />f 8e located as far from the existing or proposed curb tine as possible to avid potential future conflicts <br />8. Al non -street surface materials that are disturbed by excavation and backfilling operations shall be replaced and <br />restored <br />9. City and county street surface materials disturbed shall be backfilled. tamped and repaved by city or county forces <br />or approved paving contractor <br />10if sidewalkwheel chair 'amps or any portion of the pedestrian facaities are removed or dosed. a pedestrian detour <br />shall be established and maintained during the time of the closure and the entire oedestnan facility shall be restored <br />within seventy-two (721 hours. unless the contactor provides a hard surface alternate route approved by the city or <br />county <br />Al pedestrian detours and any reoonstrutrn+ of pedestrian facitmes shalt meet current Americans with Disability <br />Act (ADA( standards and specifications. <br />12 Ak pedestrian detours shall be par of an approved Traffic Control Plan (TCPI <br />' 3 AN holes made in the streets for the purpose of performing vacuum excavations to locate underground utilities shall <br />be restored to their original co clition with the reinstated core flush with and in the onginal onentation as the existing <br />surface matching existing pavement surface appearance. <br />'4. When the contractor is not actively working: an equior erht. fencing. debns, etc. Shall not be placed within Me <br />triangular area required for Sight distance of vehicles exiting or entering an adjacent property or ,ntersec5on_ <br />r 5 AN excavations shall be adeouately fenced and covered when contractor is not present or project site left <br />unattended <br />11 <br />18 No Sane closures allowed on artenat streets during AM and PM peak hours <br />17 All work zone traffic control. including pedestrian oonbpl measures. shall be or compliance with the MUTCD and <br />ADA <br />18. The contractor shah maintain a set of "as built' pians on site with dimensioning These plans shall be presented <br />upon request <br />19. Final "as -bulk" plans shall be filed with city and/or county within 30 days of the completion of the project <br />20 The 0Gntractor shall follow construction standards pertaining to the lateral corridor facility placement and minrnum <br />depth requirements and clearance requirements of other facilities <br />21 A current State, County. or City permit shall be maintained on each work see by the contractor The contractor <br />shag present such pertret upon request. <br />22 Any field adjustments to instaaation of facilities. which vary from the plans that have been submitted and approved <br />during the permit application process, shall comply with the following-. <br />a The contractor must stop work immediately and contact the facility owner of the proposed changes <br />b The facility owner's representative shall contact the city. county or state nght-of-way construction inspector and <br />provide Mem with the details. <br />c The ROW inspector wilt make a determination on how to proceed This determination may range from approval <br />over the phone or via email to delaying the protect until piens can be updated and appropriate review can be <br />conducted. <br />23 Stake mounted warring signs and marker posts (8)053) to be placed where appropriate <br />24 All conduit and fiber is to be installed at the back of the roadway ROW unless otherwise noted <br />25 Leave 120' loops (80' tails at splice points) for mainline fiber in vaults <br />