Laserfiche WebLink
a <br />Note: Streets Division shall be contacted prior to work <br />beginning at 308-385-5322. Any keyhole potholing <br />locations in the roadway shall be approved by the Streets <br />Division and shall be filled within five da s of ..tholin.. <br />Pull Box 1 - New UPN Pull Box <br />1 Ea. UPN Pull Box <br />80' of 96 SM Coil <br />\\1!° \lt4\ \\ <br />11 <br />570' of (2) 1.25" B, 96 SM, TW <br />From Pull Box 1 to Pull Box 2 <br />PROJECT NO. <br />SHEET N0 <br />UPN PO -40669 <br />JEO'. 230296.10 <br />De19: 01JUN-20 <br />Drawn: 1011 <br />Checked, MAF <br />Aooroved: MAF <br />Unite <br />VERIZON WIRELESS SC 9 <br />N WHEELER AVE & <br />W 12TH ST <br />GRAND ISLAND, NE <br />0 25 50 <br />Know what's below. <br />Call before you dig. <br />PRIOR TO CONSTRUCTION'. <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC, GAS MAINS. CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTIL0106 AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE. THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />IT IS THE RESPONSIBILITY OF THE <br />INDWIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />JEO CONSULTING GROUP INC <br />FIBER DESIGN <br />