Laserfiche WebLink
12 DrawingslSh <br />i <br />Note: Streets Division shall be contacted prior to work <br />beginning at 308-385-5322. Any keyhole potholing <br />locations in the roadway shall be approved by the <br />Streets Division and shall be filled within five days of <br />otholin <br />• <br />Building Entry Point <br />100' of 144 SM (Coil) <br />• <br />315 N Locust St <br />Pull Box 2 - New UPN Pull Box <br />1 Ea. UPN Pull Box <br />80' of 144 SM Coil <br />180' of 1.25" B, 144 SM, TW <br />From Pull Box 2 to Buildin• Ent Point <br />200' of (2) 1.25" B, 144 SM, TW <br />From Pull Box 1 to Pull Box 2 <br />Pull Box 1 - Ex UPN Pull Box <br />Splice New Fiber to Ex Fiber <br />80' of 144 SM Coil <br />Ja <br />PROJECT NO <br />SHEET NO. <br />UPN: P0d0688 <br />JEO: 230298.12 <br />Date : 07JUN-202 <br />Chocked, MAF <br />Owned: MAF <br />Unite <br />JEO CONSULTING GROUP <br />315 N LOCUST ST. <br />GRAND ISLAND, NE <br />0 25 50 <br />Know what's below. <br />Call before you dig. <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC, GAS MANS, CABLE <br />TELEVISION MID OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION MID <br />THEREFORE, THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY, <br />IT IS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />DUSTING UTILITY BEFORE MID <br />DURING ACTUAL CONSTRUCTION. <br />JEO CONSULTING GROUP INC <br />FIBER DESIGN <br />