Laserfiche WebLink
Note: Streets Division shall be contacted prior to work <br />beginning at 308-385-5322. Any keyhole potholing <br />locations in the roadway shall be approved by the Streets <br />Division and shall be filled within five days of potholing. <br />PROJECT NO. <br />UPN P0 -3E242 <br />SHEET NO. <br />3E0. 230285.02 <br />102 W 3rd St <br />Pull Box 2 - New UPN Pull Box <br />1 Ea. UPN Pull Box <br />80' of 96 SM (Coil) <br />Building Entry Point <br />100' of 96 SM (Coil) <br />=,'85'of(2)1.25"B,96SM,TW <br />From Pull Box 1 to Pull Box 2 h' <br />_ <br />10'of(2)1.25"B,96SM,TAN <br />From Pull Box 1 to Pull Box 2 <br />Pull Box 1 - Ex UPN Pull Box <br />Splice New Fiber to Existing Fiber <br />1 Ea. Splice Enclosure <br />80' of 96 SM (Coil) <br />DAN: 21 -APR -2023 <br />Dram: MAO <br />CAe.eG JOH <br />&grove. US <br />Unite <br />SAYLER <br />SCREENPRINTING <br />GRAND ISLAND, NE <br />0 25 50 <br />MOW what's below. <br />Call betas young. <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC, GAS MAWS, CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />ITIS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />)EO CONSULTING GROUP INC <br />.1419 <br />FIBER DESIGN <br />