Laserfiche WebLink
a. <br />Oj <br />wa112 Drawi <br />cr <br />C7 <br />0 <br />Network On -Call Fiber D <br />PROJECT COORDINATION CONTACTS <br />NAME <br />AGENCY <br />PHONE NUMBER <br />EMAIL <br />SCOTT WILGUS <br />UNITE PRIVATE NETWORKS <br />402-710-1889 <br />SCOTT. W ILGUSOUPNFI8E R.COM <br />LONNIE BURKLUND <br />JEO CONSULTING GROUP <br />402-435-3080 <br />LBURKLUND®JEO.COM <br />PERMITS REQUIRED <br />SHT. NO. <br />DESCRIPTION <br />4 - fi <br />RIGHTOE.WAV I EASEMENT UTILITY PERMIT <br />CITY OF GRAND ISLAND <br />4-6 <br />RIGHT-OF-WAY CONSTRUCTION PERMIT <br />CITY OF GRAND ISLAND <br />SHT. NO. <br />SHEET INDEX <br />1 <br />COVER <br />2 <br />GENERAL NOTES <br />3 <br />DETAILS <br />4 <br />- 5 <br />FIBER DESIGN <br />6-7 <br />TRAFFIC CONTROL <br />CONTRACTOR WILL BE REQUIRED TO OBTAIN A PERMIT TO WORK IN THE <br />ROW (INCLUDING AN APPROVED TRAFFIC CONTROL PLAN) BEFORE ANY <br />PHYSICAL WORK IS TO TAKE PLACE. LOCATE FLAGS SHALL BE REMOVED <br />AFTER THE 'EXCAVATOR' HAS DETERMINED THE WORK IS COMPLETE. <br />EXHIBIT "A" 2023/3/2 <br />5 POINTS BANK - RENEWAL <br />TRACKER NO. 27301 <br />PROJECT NO <br />SHEET NO <br />UPN: P0-37673 <br />JEO 200438.99 <br />Date: 22 -FEB -2023 <br />Drown: BHB <br />Checked: MAF <br />Approved: MAF <br />Unite <br />5 POINTS BANK - <br />RENEWAL <br />GRAND ISLAND, NE <br />NOT TO SCALE <br />Know what's below. <br />Call below you dig <br />PRIOR 70 CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC. GAS MAINS. CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE. THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />IT IS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />JEO CONSULTING GROUP INC <br />0;:s <br />COVER <br />