Laserfiche WebLink
MATCH LINE SHEET F.6 <br />PROJECT N0. <br />SHEET 1,10. <br />017-0078 <br />F.7 <br />See Sheet F,5 <br />125' B 144 SM TW <br />PW Box 7-1 - Approx. 3' South & T Easl of Utility Pole <br />1 Ea. UPN Pull Box <br />80'of144 SM Coil <br />1,289' o11.25" B, 144 5M, TW <br />From Pull Box 7-1 to UPN PoN Box A <br />Route Around Ualily Pole <br />Route Around Uti4ty Pole <br />4From EOP <br />Air ort Avenue /5k Park Road <br />co <br />LL <br />H <br />w <br />w <br />(.n <br />w <br />z <br />J <br />2 <br />0 <br />Date: 03,08,2025 <br />400 Scale 1 50 <br />Damn: DAR <br />05400W: STS <br />849x0072: STS <br />PROJECT: 41070 -ALTER METAL RECYCLING <br />1119 E. 4TH STREET <br />olsso <br />Unite <br />PRIM Yfr.01113 <br />errs — Eafww <br />0xe1W►dmilKCillednegeede� <br />PWOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC, GAS MAINS, CABLE <br />TELEVISION AND OTHER UTIUT1ES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTTED FROM <br />AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />APPROXIMATE ONLY. R IS THE <br />RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH EXISTING UTILITY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CITY <br />OF GRAND ISLAND STANDARD <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />FIBER DESIGN <br />