Laserfiche WebLink
Notes from City <br />Jun 6, 2022 at 2:31 pm <br />Travis Burdett <br />- Maintain 3' separation from underground electric. <br />Jun 6, 2022 at 10:36 am <br />Ryan Schmitz <br />- Maintain 3' of separation from any paralleled water mains <br />Jun 6, 2022 at 8:39 am <br />shannon callahan <br />- Vaults or HH shall not be placed on the sloped bank or flowline of open drainage <br />ditches if possible. If this cannot be avoided the vault or HH final grade shall match <br />that of the sloped bank of the ditch. Erosion control shall be used during and after <br />excavation to ensure the ditch is restored properly. <br />- Hwy 281 & Wildwood - future traffic signal and roadway improvements are <br />planned for this area soon. Path and vault locations shall be coordinated with <br />Olsson Associates. <br />Jun 6, 2022 at 11:32 am <br />Keith Kurz <br />- pg 32 make sure to be deep at tri street. looking at ditch grading along highway 34 <br />and potential new culvert at tri that would be deeper. <br />- pg 75-76 coordinate with Brian degen at olsson grand island for wildwood <br />construction. roadway will be widened on east and west side of 281. new signal at <br />281 and wildwood as well. 308-384-8750 <br />