Laserfiche WebLink
202300905 <br />regulated and required with the building permit for each such lot. <br />The Subdivider must select curb or conventional sidewalk for each street unless the requirement has <br />been waived by Council. <br />Street Name <br />Curb sidewalk <br />Conventional Sidewalk <br />Sidewalk Requirement <br />Waived by Council <br />Tech Drive <br />X <br />NO <br />Wortman Drive <br />X <br />NO <br />U.S. Highway 34 <br />Yes due to existing trail <br />on college property <br />6. Electric. The Subdivider agrees to install all conduit, both primary and <br />secondary, as well as all necessary transformer pads in the subdivision in accordance with plans <br />and specifications approved by the Utilities Department, and subject to the City's inspection. <br />7. Easements. Any easements shall be kept free of obstructions and the <br />Subdivider shall indemnify the City for any removal or repair costs caused by any obstructions. In <br />addition, the duty to maintain the surface of any easements to keep them clear of any worthless <br />vegetation or nuisance shall run with the land. <br />8. Landscaping. The Subdivider agrees to comply with the requirements of the <br />Landscaping Regulations of the City of Grand Island, and plans as submitted to and approved by the <br />City's Building Department. <br />9. Engineering Data. All final engineering plans and specifications for public <br />improvements shall bear the signature and seal of a professional engineer registered in the State of <br />Nebraska and shall be furnished by the Subdivider to the Department of Public Works for approval <br />prior to contracting for construction of any improvements. Inspections of improvements under <br />construction shall be performed under the supervision of a professional engineer registered in the <br />-4- <br />