Laserfiche WebLink
ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall be notified a minimum of forty eight (48) hours in advance of initial project construction. <br />12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the lime of the closure and the entire pedestrian facility shall be restored within seventy -Iwo (72) hours, unless the <br />2. The contractor shall adhere to the current City standard specifications, approved special provisions. City standard plana. right-of-way eonsmxlion <br />procedures manual. <br />contractor provides a hard surface alternate route approved by the city. <br />3. The locations of all genal and underground utility facilities may not be indicated on the project plans The contractor is required to contact the One <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />specifications. <br />Call S I I notification center (dial al I) forty-eight (46) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible fur <br />14 All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locale underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />facility is unknown, the permittee shall use special measures to determine the locations of such underground facilities. <br />surface appearance. <br />a. If the permittee is conducting the excavation by digging from the surface, when in a close proximity to the underground facilities, the permittee <br />16. When the contractor is not actively working, all equipment, fencing. debris, etc, shag not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locale such facility. <br />If the permittee is conducting the excavation by tunneling or bonng, the perminee shall determine the vertical location of the underground <br />sight distance of vehicles exiting or entering an adjacent <br />property or intersection.b. <br />facility by potholing or any other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs, poles, <br />18. No lane closures allowed on arterial steels during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. lire hydrants. etc.) clearly identifying location of such facility. The contractor shall verify dimensions taken from city tiles. <br />section(s) staff. <br />6. Unless specified an the plan sets, the depth of installed taeilities in city row shall Mal a minimum as follows. <br />19. All work zone traffic control, including pedestrian coned measures. shall be in compliance with the MUTCD. ADA, and the City Standard <br />a. Thbty-two 132) inches in soil, if rock present and is an issue twenty-four (24f inches can be used. <br />Specifications. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />b. Forty-two(42) inches below a projected slope from the lbw line of a ditch at a three (3) horizontal and one i I) vertical slope. <br />21 The contractor shall nobly all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Forty-eight (46) inches under a roadway measured horn the surface of said roadway to the top of the Installation. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight 1461 inches under a storm water or creek channel design bottom of pipe, and <br />22. The contractor shall maintain a set of "as built' plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />c. MainCaine minimum of twenty-four (24) inches of vertical and horizontal staciaa thrust existing utilities. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />I Be located as for from the existing or proposed curb line as possible to avoid potential tame conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locate flags after work is complete. <br />7. All potholes in sidewalk panels will be filled unless directed by City inspector. If colored textured or patterned concrete is existing, replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs prier to <br />.afling work. <br />25. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process, shall comply with the following. <br />I. All non -street surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />0. City street surface materials disnubed shall be backfilled, tamped and repaved by city forces or approved paving contractor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the <br />proposed <br />changes. <br />10. All Conduit, vaults and Pedestals shall be located in the public ROW and in public utility casements. <br />I I. All Aerial attached be by Pole Owners. All to follow <br />c. The City inspector will make a determination on tow to proceed. This determination may range from approval over the phone or Wan <br />NM= Neill side <br />��� <br />shown on plaaset will permitted separately pole permits submitted pole owners will <br />NESC codes. <br />mail to delaying the project until plans can be updated and appropriate review can be conducted. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />Il•mermen" <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />COW= Pa4ee <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />rt. 10w"r11"13' <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />tl-c!<¢•u-rsorr""". <br />b. Conduit shall be offset a minimum of Fine (5) feel from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />a_xorna- <br />ma <br />Conduit cannot be offset a minimum of Five (5) feel from the base of any traffic signal cabinet. traffic signal pole, or traffic signal pull box <br />because of physical constraints, a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified en- <br />Meilln,10,4 A,114111.11.1101, C. <br />MEN. 1111311.1XMILINI WIT Illta."0.= <br />- <br />SpfciAllfielle it shag be bored unless specified otherwise. <br />2 Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />sile before boring. II unable to maintain six (61 feet of depth where crossing existing signal conduit, a meeting will be held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4 The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the TIB "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />N <br />AIcirIO <br />ot <br />A <br />