ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of forty eight (48) hours m advance of initial project construction. <br />12. If sidewalk, wheel chair ramps of any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />2. The contractor shall adhere to the current City standard specifications, approved special provision. City standard plans. right-of-way comtru ion <br />procedures manwl. <br />contractor provides a hard surface alternate route approved by the city. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One <br />specifications. <br />Call X) I notification center (dial XI 1) forty-eight (4X) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the tudergmund utilities until all facilities have been located and identified to the satisfaction ofall parties. The contractor shall he responsible for <br />14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or wheneser the vertical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />facility is unknown, the permittee shall use special measures to determine the locations of such underground facilities. <br />surface appearance. <br />a. If the penninec a conducting the eacavation by digging from the surface, when in a close proximity to the underground (acilittes. the permittee <br />16. When the contractor is not actively working. all equipment, fencing. debris, ale, shag not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that arc approved by We City to locate such facility. <br />sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. If the permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vented location of the underground <br />facility by potholing or any other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new factlnies being installed. Measurements shall be taken from existing adjacent visible structures (curbs. poles, <br />18. No lana closures allowed on arterial streets during AM and PM peak hours unless approved by Cary Traffic and Right of Way Construction <br />cabinets, manholes, inlet. fire hydrants etc.) clearly identifying location of such facility. The contractor shall venni dimensions taken from city tiles. <br />section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed facilities in city row shall be oma minimum as follows. <br />19. All work zone traffic control. including pedestrian control measures. shag be to compliance with the MUTCD. ADA, and the City Standard <br />a. Thirty-two 432) troches in soil, if rock present and is an issue twenty-four (24) inches can be used. <br />Specifications. <br />b. Forty-two (42) inches below a projected slope from the (low line of a ditch ata three (3) horiauntal and one i1 vertical slope. <br />20, The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Forty-eight (4R) inches under a roadway measured from the surface of said roadway to the by of the installation. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (48) inches under a storm water or creek channel design bottom of pipe, and <br />22. The contractor shall maintain a set of 'as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />e. Maintain a minimum of minty-four (24) inches of vertical arid horizontal spacing from existing utilities, <br />21 A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />f Be located as far from the existing or proposed curb line oe possible to avoid potential thnue conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locale flags after work is complete. <br />7. All potholes in sidewalk panels will be tilled unless directed by City inspector. )(colored textured or patterned concrete is existing, replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs prior to <br />starting work <br />25. Any field adjustments to installation of facilites, which vary from the plans that have been submitted and approved during the permit <br />application process, shag comply with the following: <br />X. All non-street surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />9. City street surtace materials demised shall be backfilled, tamped and repaved by city forces or approved paving contractor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the <br />proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall he located in the public ROW and to public utility easements. <br />matron <br />11. All Aerial be by Pole Owners, All to follow <br />c. The City inspector wilt make a determination on how to proceed. This determination may range from approval over the phone or viae <br />4r4kFaw <br />shown on attached planet will permitted separately pole permits submitted pule owners will <br />NESC codes, <br />mail to delaying the project until plans can he updated and appropriate review can be conducted. <br />8�t <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />1�j7 <br />coom sorra balsa`'. <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />CairloaAw <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />30°'o`LL ",,, <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />b. Conduit shall be offset a minimum of Five (5) feel born the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />as>c -ax sur c'rn w <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet,net, traffic signal pole, or traffic signal pull box <br />because of physical constraints, a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />-.1ocrAto W.I., <br />- <br />cwxs �mnr <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit. Traffic Signal conduit shall be potholed and verified on- <br />@..n..0 <br />SpeciAllf11011Uuit shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit. a meeting will he held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4. The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Slmilady, <br />bypass the T18 "Flowerpot' with MST co duit where installed parallel to future drop conduit. <br />Alto <br />ji)etnet <br />N <br />A <br />