My WebLink
|
Help
|
About
|
Sign Out
Browse
202300455
LFImages
>
Deeds
>
Deeds By Year
>
2023
>
202300455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:47:16 PM
Creation date
1/30/2023 2:46:10 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202300455
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall be notified a minimum of forty eight (48) hours in advance of initial project constna:tion. 12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-Iwo (72) hours, unless the <br />2. The contractor shall adhere to the current City standard specifications, approved special provisions. City standard plans rightof=way construction contactor provides a hard surface alternate route approved by the city. <br />procedures manual. <br />3. The locations of all ectal and underground utilityfacilities maythe indicated on - 13. All pedestnan detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />g no project plans. The contractor is required to contact the One specifications. <br />Call 811 notification center (dial 8I I) forty-eight (481 hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all panics. The contractor shall be responsible for 14. All pedestrian detours shaN be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground facilities am in close proximity to the proposed pathway location or whencter the vertical location of the underground their original condition with the reinstated core flush with and in the original orientation es the existing surface matching existing pavement <br />facility is unknown. the permittee shall use special measures to determine the locations of such underground facilities. surface appearance. <br />a, It' the permittee is conducting the excavation by digging born the surface, when in a close proximity to the underground facilities. the pennmee 16. When the contractor is not actively working, all equipment, fencing. debris. etc, shah not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating. or any other techniques that are approved by the City to locate such facility. sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. If the permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. 17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs, poles, 18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. fire hydrants, etc.) :early identifying location of such facility The contractor shall verify dimensions taken from city tiles. section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed facilities m city row shall be ata minimum as follows. 19. All work zone traffic control, including pedestrian control measures. shall be in compliance with the MUTCD. ADA, and the City Standard <br />Specifications. <br />e. Thirty-two 132) inches in soil, if rock present and is an issue twenty-fear 1241 inches can be used. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />b. Forty-two (42) inches below a projected slope from the flow Ime of a ditch ata three (3) horizontal and one I11 vertical slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Forty-eight (48) inches under a roadway measured from the surface of said roadway to the lop of the installation. and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (481 orches under a stone water or creek channel design bottom of pipe, and 22. The contractor shall maintain a set of "as built' plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />c. Maintain a minimum of twenty-Ibur (241 inches ot'vertical and horizontal spacing from existing utilities. <br />t. Br located as far from the existing d curb line aspossible to avoid 23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each <br />g or proposepotential future conflicts. the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />work site by <br />24. The contractor shall remove locate flags after work is complete. <br />7. All potholes in sidewalk panels will be filled unless directed by City inspector. If colored, textured or patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs pnur to 25. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />starting work. application process, shall comply with the following: <br />8. All inn-street surface materials that are disturbed by excavation and backbiting operations shall be replaced and restored. a. The contractor must slop work immediately and contract the facility owner. <br />9. City street surface materials disturbed shall he backtilled, <br />tamped and repined by city tones or approved paving contractor. b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the <br />proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall be located in the public ROW and in public utility easements. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />mora:. NNa4atal. <br />II. All Aerial shown on attached planer will be permitted separately by Pole Owners. All pole permits submitted to pule owners will follow mall to delaying the project until plans can he updated and appropriate review can be conducted. <br />NESC codes. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />• D <br />R11 <br />I y <br />morons '7 <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />CliWaNthti <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />w fO1@"atr" <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />ra, AtitatainOtin eller tie' <br />b. Conduit shall be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />iron. c cwrn a <br />Conduit cannot be offset a minimum of Five (5) feel from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />because of physical constraints, a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />natairori Tam toramn mars cream= <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified on- <br />cw,a,aa <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will he held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />SPeckeillfitNeitait shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the readerthe drawings are scaled, Thus dimension is evadable at all locations. <br />4. The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the T18 "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />Allo <br />N <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.