Laserfiche WebLink
Utililty Pole 1 <br />Splice New Fiber to Ex Aerial Fiber <br />Install New Fiber in Riser <br />1 Ea. Splice Enclosure <br />1 Ea. Riser <br />i <br />90' of 2" B, 96 SM, TW <br />From Pull Box 1 to Ex 4" Customer Conduit <br />445' of 2" B, 96 SM, TW <br />From Utility Pole 1 to Pull Box 1 <br />Ex 4" Customer Conduit <br />Ca g Lure Ex 4" Customer Conduit Ad'acent to Pole <br />• <br />50' • <br />40' of 96 SM (In Ex 4" Customer Conduit) <br />From Ex 4" Customer Conduit to Building Ent Point <br />Building Entry Point <br />100' of 96 SM (Coil) <br />Pull Box 1 - New UPN Pull Box <br />1 Ea. UPN Pull Box <br />80' of 96 SM (Coil <br />M <br />,10 <br />PROJECT N0. <br />UPN: P651214 <br />SHEET NO. <br />JED: 200,13eB4 <br />Date: DbSEP-2012 <br />Drawn'. JDH <br />Checke8: MAF <br />Aoeravea: LAS <br />Unite <br />KELLY SUPPLY CO. (S1) <br />1004 W OKLAHOMA AVE. <br />GRAND ISLAND, NE <br />0 25 50 <br />CMM NI pia" <br />PRIOR TO CONSTRUCTION: <br />CALL Bit FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC. GAS MANS. CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS MUST <br />SE CONSIDERED APPROXIMATE ONLY. <br />ITIS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />NEO CONSULTING GROUP INC <br />FIBER DESIGN <br />C1 <br />C' <br />Co <br />