My WebLink
|
Help
|
About
|
Sign Out
Browse
202208057
LFImages
>
Deeds
>
Deeds By Year
>
2022
>
202208057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 1:37:41 PM
Creation date
11/17/2022 12:34:18 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202208057
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of forty eight (48) hours in advance of initial project construction. 12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-Iwo (72) hours, unless the <br />2. The contractor shall adhere to the current City standard specifications, approved special pros isions. City standard plans. nght-of-oa) construction <br />procedures manual. <br />contractor provides a hard surface alternate route approved by the city. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One <br />specifications. <br />Call 811 notification center (dial 811) forty-eight (4x) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all panics. The contractor shall be responsible for <br />14. All pedestrian detours shah be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All hobs made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4 Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground <br />their orginal condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />facilely is unknown. the permittee shall use special measures to determine the locations dutch underground facilities. <br />surface appearance. <br />a. lithe permiuec is conducting the excavation by digging from the surface, when in a closeproximity to the underground f ihes. the permittee <br />16. When the contractor o not actively working, all equipment fencing debris. etc, shall not be placed within the triangular area required for <br />shall use hand digging hydro excavating, air excavating, or any other techniques That are approved by the City to locale such (wilily. <br />sight distance of vehicles exiting or entering an adjacent property or intersection, <br />b. ((the permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (cubs. poles, <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. lire hydrants. etc.) clearly identitying location of such facility. The contractor shall verily dimensions Wren from oily tiles. <br />section(s) Staff. <br />6. Unless specified on the plan sem, the depth of installed facilities in city row shall be ata minimum as follows. <br />19. All work zone traffic control, including pedestrian control measures, shall be In compliance with the MOTCD. ADA, and the City Standard <br />a. Thirty-two 132) inches in soil, if rock present and is an issue twenty-four (24) inches can he used. <br />Specifications. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />b. Forty-two (42) inches below a projected slope from the (low line of a ditch ata three (3) honronszl and one I1 vertical slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Foray-eight (48) inches under a roadway measured from the surface of said roadway to the top of the Installation. <br />and protide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (48) inches under a storm water or creek channel design bottom of pipe, and <br />22. The contractor shall maintain a set of "as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />c. Maintain a minimum of twenty-four (24) inches tat vertual and horizontal spacing from existing utilities. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />f Be located as far hum the existing or proposed curb line as possible to avoid potential link conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locale flags after work Is complete. <br />7. All potholes in sidewalk panels will he filled unless directed by City inspector. It-colored. textured or patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs prior w <br />stamng work, <br />25. Any held adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process, shall comply with the following: <br />N. All nun-street surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />9. City street sortacc materials disturbed shall be backfilled, tamped and repaved by city lures or approved paving contractor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the <br />proposed <br />changes <br />(0, All Conduit. vaults and Pedestals shall be (nested in the public HOW and in public utility easements. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />wta s flilNriallla <br />11. All Aerial shown on attached planet will be permitted separately by Pole Owners. All pole permits submitted hr pule owners will follow <br />mail to delaying the project until plans can he updated and appropriate review can he conducted. <br />NBSC codes. <br />26. Crossing City GrandGrandffi <br />of GIsland Trac Signal Infrastructure <br />8 <br />11 <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />Call been pi048 <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />b. Conduit shall be offset a minimum of Five (5) feel from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />x¢st <br />Conduit cannot be offset a minimum of Five (5) feel from the base of any traffic signal cabinet. traffic signal pole, or traffic signal puN box <br />because of physical constraints, a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired S of offset. <br />l ,,,,a r. <br />c. Conduit shall be placed six (6) feel deep where crossing existing signal conduit, Traffic Signal conduit shah be potholed and verified on- <br />""w'1T1e"'" <br />Specs 111NOt0Wit shall be bored unless specified otherwise. <br />2. Contractors shall nobly land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will he held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4 The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST concha Similarly, <br />bypass the 718 "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />Allo <br />N <br />