Laserfiche WebLink
r AQ17 <br />AP18 <br />2520 <br />2518 <br />2516 <br />2514 <br />2512 <br />2510 <br />2508 <br />2506 <br />2504 <br />2430 <br />2428 <br />2426 <br />2424 <br />2422 <br />PON: GDI-01-27 <br />DCR: <br />PIONEER BLVD <br />2519 <br />500 <br />2517 <br />172' <br />(4) MST ,(1)46.(1) 144,(1) 288 <br />750R <br />2515 <br />80218 <br />2513 <br />1(1)MST _ (1)48. (1) 144(1(288 <br />2511 <br />2509 <br />2507 <br />107' 108' <br />(1) 657. (1) 48,(1) 104, (11288 (1(48(1)144_(11268 <br />110' <br />(2) MST, (1)48 (1)144.11) 286 <br />1 <br />1(1)48, (1) 144, (1) 2BB <br />Easement shown along <br />proposed underground paths <br />on htlpsJ/gis.grand- <br />is)and.coMmaps/parceU <br />F048418 <br />80244 <br />2503 <br />2429 <br />Inside of polygon was <br />approved with LA -22-18 <br />80243 <br />2508 <br />toe <br />111 MEI 11148. (/1144,11128e <br />14S <br />(9)MST (1)48.(2)2800)578 <br />80242 -i 80303 <br />2427 <br />2125 <br />2423 <br />7505 <br />2421 <br />105' 100 <br />(5) MST. (1)286 (4)851.(1)288 <br />571 <br />;AST (1)57, <br />2410 <br />Sot—M): Esn, Maser, Ge( Eye, <br />FIBER •s3 : ' <br />Notes: <br />O),4 ,140 2024 <br />Fa c45. <br />2) MSI..(148.((1) 266,(1) 576 gg ' NN..� <br />paphlcs,-�NES1Airbus�DS, U�DA, US � er`GRID, IGN, and tl GIS se1PP�€im7nuniy <br />111 <br />PERMIT: <br />LEGEND Date: 6/2/2022 <br />poR STRUCTURE <br />FIBEREOUPMENT ® Small PED <br />U 44614 SPUCECLOSURE <br />8814) <br />O M6T 2 <br />Aara)Strand <br />® <br />RISER <br />POLE - UG Bore <br />• Unknown - Feeder Fder <br />1 11 AL10 Gontluu <br />MST Runs <br />(3) MST, (1) 288 <br />If there is a stub pole next to a new primary pole, make sure to attach to the primary pole, so the stub pole can be removed once phone <br />has removed their equipment <br />Revisions: <br />N <br />lin = 112 ft <br />AQ18 <br />1 1 <br />AP19 <br />AQ78 <br />Page 12 of 79 <br />