Laserfiche WebLink
Page 6 of 57 <br />PON: PON.name <br />DCR: <br />PERMIT: <br />LEGEND <br />Date: 8/15/2022 <br />STRUCTURE <br />_ pCN <br />FIBEREOUIPMENT <br />© 1152 Cabinet <br />4 MST 4 Eil T60 Vault <br />2 MST SPLICECLOSURE <br />RISER ►, UG <br />POLE Aerial <br />el Jnknawn <br />Aerial Strand <br />UG Bore <br />250 5 <br />Feeder Finer <br />1 1 1 1 Conduit <br />City of Grand Island Park <br />Maintenance is to be contacted <br />prior to PON Cabinet installation <br />to approve location in respect to <br />their sprinklers. <br />704 <br />PON23 CabineVMaintenance <br />Vault location. See next page <br />for more oerail. <br />652 <br />OpE <br />PL02]5 <br />GAB0001 <br />MV0001 75 <br />(1) 9, (1)664 <br />7'(1)2.0. (3) 1.25 <br />sFp <br />11) 96. (11266.11) 664 <br />1rae,v. rP 133 //'- <br />AF24 <br />I AF25 <br />I AF26 <br />651 <br />647 <br />tt 11196.11)884 <br />AG24 <br />AG25 <br />AG26 <br />643 @p. PL0134 <br />415 <br />250 ft,.r. <br />AH24 <br />I \ AH25 <br />AH26 <br />500 n <br />656 69' <br />{Si MST .1,86. 1, tlti4 <br />652 <br />�E PL014] <br />6a6 �E�ESP„ <br />Source: Esri, Maxac Earthstar Geographies, and the GIS User <br />A110has <br />.�� <br />Notes: <br />If there is a stub pole next to a new primary pole, make sure to attach to the primary pole, so the stub pole can be removed once phone <br />removed their equipment <br />811 <br />FIBER..r�wy• <br />Revisions: 8/15 - reshaped feeder route to run underground along Bismark, then aerially along Cherry to the PON cabinet <br />1 In = 112 ft <br />Page 6 of 57 <br />