ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall he notified a minimum of forty eight (411) hours in advance of initial project construction. 12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed. a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within sevenly-Iwo (72) hours. unless the <br />2 The contractor shall adhere to the current City standard specifications, approved special provisions, City standard plans, right-of-way construction contractor provides a hard surface alternate route approved by the city. <br />procedures manual. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One specifications, <br />Call 811 notification censer (dial 811) forty-eight (411) hours poor to working in the city right away. No excavation will bo permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible for 14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP), <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locale underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertk:al location of the underground their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />facility is unknown, the permittee shall use special measures to determine the locations of such underground facilities. surface appearance. <br />a. If the permittee d conducting the excavation by digging from the surface, when in a close proximity to the underground facilities. the permittee 16. When the contractor is not actively working, all equipment, fencing, debris, etc, shall not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locate such facility. sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. If the permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. 17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible swdures (curbs, poles, 18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets, tire hydrants. etc.) clearly identifying location of such facility. The contractor shall verily dimensions taken from city files. section(s) staff. <br />6. Unless specified on the plan sets. the depth of installed facilities in city row shall beat a minimum as follows. 19. All work zone traffic control, including pedestrian control measures, shall be in compliance with the MUTCD, ADA, and the City Standard <br />Specifications. <br />aThirty-Iwo (32) Iahes in soil. if rock presets and is an Issue twenty-four (24) inches can be used. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior Ip any lane or road closures. <br />b. Forty-two (42) inches below a projected slope from the Bow hon of a ditch ata three (3) horizontal and one (I) vertical slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />e. Furry -eight (48) inches under a roadway measured from the surface of said roadway to the top of the installation. and provide updates to the affected owners when construction phases charge That affect the areas of work associated with the permit. <br />d. Forty-eight (48) inches under a storm water or creek channel design bottom of pipe. and 22. The contractor shall maintain a set of "as built' plans on site with dimensioning. These plans shall be presented upon request <br />representative. <br />e. Maintain a minimum of twenty -fur (24) inches of vertical and horizontal spacing from existing utilities. <br />to any city <br />work site by <br />23. A current city right of way construction permit, a city approved plan set. and traffic control plan shall be maintained on each <br />f Be located as far from the existing err proposed curb line as possible to avoid potential faire conflicts. the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shah remove locale flags atter work Is complete. <br />7. All potholes in sidewalk panels will be tilled unless directed by City inspector. 11 colored, textured or patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs prior to 25. Any field adjustments to installation of Middies, which vary from the plans that have been submitted and approved during the permit <br />starting work. application process. shall comply with the following: <br />8. All non -street surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. a. The contractor must stop work immediately and contract the facility owner. <br />9. City street surface materials disturbed shall be backfilled, <br />tamped and repaved by city forces or approved paving contractor. b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the proposed <br />changes. <br />10. All Conduit, vaults and Pedestals shall be located in the public ROW and in public utility casements. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />turfs• 1a►pl.Wk <br />11. All Aerial shown on attached planet will be permitted separately by Pole Owners. All pole permits submitted to pole owners will follow mail to delaying the project until plans can be updated and appropriate review can be conducted. <br />NESC codas. <br />^�� <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />VX <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. 11 unable to route the <br />Cal tr. was <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />i'.`°iO`m`''- <br />meeting will be held onsite with the contractor. city, and ALLO to determine the best conduct alignment between these structures.'xat,. <br />>oa 2,,,,,,Ab. <br />Conduit shah be offset a minimum of Five (5) feet from the base of any traffic signal cabinet. traffic signal pole. or traffic signal pull box. If <br />.uta. " alira Ma TM CnidraALC. AND MAW., <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />because of physical constraints, a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />1110006 NM WCATIMI NAV' IACCNICHE <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit Traffic Signal conduit shall be potholed and verified on- <br />141011Ctluill MID* 1.11.111,11.1 .1:101.1., <br />.enuomerucrso.. <br />site before boring. 9 unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will be held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />SpeCiMlljOMMnt shall be bored unless specified otherwise, <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />4. The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the T18 "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />Ca <br />N) <br />CD <br />Allo <br />N <br />A <br />Je( e <br />