Laserfiche WebLink
CEMETERY <br />OR <br />CEMETERY DR <br />CEMETERY <br />DR <br />CEMETERY <br />PON: <br />DCR: <br />PERMIT: <br />GDI-01-19 <br />LEGEND Date 9/23/2022 <br />ED30R STRUCTURE <br />FIBEREQU1PMENT Srall PED <br />723 MS1 2 T48 vault <br />POLE ROUTE <br />0 Unxnowr Placement Type <br />CEMETERY DR <br />CEMETERY DR <br />CEMETERY DR <br />VL0131 n <br />a <br />z n <br />80'_._ P1030 <br />(1) MST <br />arrangements with the <br />Cenletary should be made <br />prior to and during work <br />adjacent to the cemetery. <br />Please add a note on this <br />page as to such with contract <br />information for the City of <br />Grand Island Cemetery. <br />CEMETERY DR V <br />3 <br />NST <br />500009 <br />178 (1) 2.0. (1)1.25 <br />,)432 <br />1300 <br />P00166 <br />AO13 <br />5 (1)20 02, 1.0. <br />MST. (4) 43? <br />Aenal Stsoo <br />UG Bore <br />Feeder Fiber <br />ALLO Condo( <br />MST Runs <br />AN14 AN15 <br />A014 <br />0 <br />m <br />source. iEsri, Mazar. Earlhs:ar Geographies, and the GI <br />ALLO <br />FIBER <br />Notes: If there is a stub pole next to a new primary pole. make sure to attach to the primary pole, so the stub pole can be <br />removed once phone has removed their equipment <br />Revisions: <br />N <br />Page 22 of 32 <br />1 i = 112 ft <br />AP13 <br />AP14 <br />A015 <br />AP15J <br />v <br />V <br />0 <br />