Laserfiche WebLink
ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall be notified a minimum of forty eight 148) hours in advance of initial project construction. <br />11 If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-Iwo (72) hours, unless the <br />2. The contractor shall adhere to the current City standard specifications, approved special provisions. City standard plans. right-of-way conturtion <br />procedures manual. <br />contractor provides a hard surface alternate route approved by the city. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One <br />specifications. <br />Call 911 notification center (dial XII) forty-eight (4k) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible fur <br />protection of all underground and aerial utilities and infrastructure. <br />14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4 Whenever underground facilities are ie close proximity to the proposed pathway location or whenever the ironical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />tacility is unknown. the permittee shall use special measures to determine the locations of such underground facilities. <br />surface appearance, <br />a. It'd. permia. is conducting the excavation by digging from the surface, when in a close proximity to the tmdergmutd facilities, the permittee <br />16. When the contractor is not actively working, all equipment, fencing. debris, etc. shall not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, or any other techniques that arc approved by the City to locate such Iacility. <br />b. If the permitter is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />sight distance of vehicles exiting or entering <br />g 9 an adjacent property or intersection. <br />facility by potholing or any other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor w not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs, poks, <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets, fire hydrants. etc.) clearly identifying location of such facility. The contractor shall verity dimensions taken from city files. <br />section(s) staff. <br />6. Unless specified on the plan vets, the depth of installed facilities in city row shall be ata minimum as follows. <br />19. All work zone traffic control. including pedestrian control measures. shall be in compliance with the MUTCD, ADA, and the City Standard <br />a. Thirty-two 4321 inches in soil, if rock present and is an issue twenty-four (24) inches can be used. <br />Specifications. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or mad closures. <br />b. Forty-two 142) inches below a projected slope from the flow line of a ditch ata three (3) horizontal and one I I) ventral slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Forty-eight (48) inches under a roadway measured from the surface of said roadway to the top of the installation. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (4e) inches under a storm water or creek channel design bottom of pipe, and <br />22. The contractor shag maintain a set of as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />e. Maintain a minimum of twenty-tour 1241 inches of vertical and horizontal spacing torn exinina utilities. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />I. Re located as far from the existing or proposed curb line as possible to avoid potential tantrc conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />7. All potholes in sidewalk panels will be filled unless directed by City inspector. if colored textured or pancmcd concrete is existing, replacement <br />24. The contractor shall remove locate flags after work is complete. <br />patches, and panels panels will be replaced to mulch as practicable. Owner may be required to put money into escrow to coven all repairs prior to <br />darting work. <br />25. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process, shall comply with the following: <br />k. All masted surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />9. City street surface materials disturbed shall be backtilled, tamped and repaired by city tones or approved paving contractor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the <br />proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall be located in the public ROW and in public utility easements. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />oolviasom aeaiataata <br />I I. All Aerial shown on attached planet will be permitted separately by Pole Owren. All pole permits submitted to pole owners will follow <br />NESC codes. <br />mail to delaying the project until plans can he updated and appropriate review can be conducted. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />- <br />4" <br />a. Conduit shall riot be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />Call Lelwo ratan <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />b. Conduit shall be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />canwve »m s arm s <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />WIT 0=17111(.011.1,6100 PO.. <br />because of physical constraints. a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5 of offset. <br />1111M16 TIMILKATIOM Wain CM.= <br />ANNOMIAMMI.11 11,71.11110•01l01 al TIM <br />Orn. 0.1.71:{51V.ACTIVIWATI A., <br />1.1871.11.00M4 ,77-111 BORE ASO u. <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified on- <br />,,,,,,,...~..", <br />SpfnJ lf{OlN/tsit shall be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will be held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4 The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the Tt8 "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />Allo <br />N <br />A <br />- Qn Pinel -- <br />