Laserfiche WebLink
tt)96 <br />r. <br />18601723090 <br />j16 <br />j 9 <br />15601» /� <br />09. <br />G�.4'1P <br />0'59FIBEREO <br />7:0173 <br />es' <br />J <br />Msrr6 <br />4.1 <br />3410 <br />3325 <br />/ <br />3200 <br />30880,56 <br />3100 <br />0p4. <br />3242 <br />32-? <br />t. <br />/4)5 ,3 Ohb <br />3239 <br />So.,rce: Esn, Maxar. Earthstar Geographies. and the GIS User Con,. <br />PON: GDI-01-18 <br />DC R: <br />PERMIT: <br />LEGEND <br />Date: 9/1/2022 <br />Z <br />Strand <br />PONs <br />UIP YERT <br />, WI <br />POLE <br />• unknown <br />SPUGEGLOSURE <br />Mr.l <br />ROUTE <br />a Pan. <br />JAJ4 <br />I AJ1 <br />I AJ16 <br />7 <br />AK14 <br />AK15 <br />AK16 <br />AL14 <br />I AL15 <br />I AL16 <br />ALloA-- <br />u. <br />811 <br />Notes: <br />Revisions: <br />If there is a stub pole next to a new primary pole. make sure to attach to the primary pole, so the stub pole can be removed once phone <br />has removed their equipment <br />N <br />1 in = 112 ft <br />Page 15 of 71 <br />3 <br />CD <br />N) <br />r') <br />CD <br />